دانلود انجام بازرسی فنی جوش و متریال بر اساس ASME IX ,ASMEII
QW
WPS,PQR
WPQ
Welding data
QW100:
GENERAL
QW110:
Weld orientation.
QW120
Test position for groovweld
QW130
Fillet weld
QW140
Type and purposes of test and examination
QW150
TentionTest
QW160
Guidbend test
QW170
Notch ToughnesTest
QW180
Fillet weld QW190
Other test and examination
APP I
Round indication
chart
QW200
GENERAL
QW210
PREPERATION OF TEST COUPON
QW250
Welding Variable
QW300
General
QW310
Qualificatinof test
coupon
QW320
Retest and renewal
Of Qualification
QW350
Welding Variable
For welder
QW360
Welding Variable
For welding operator
QW400
Variable
QW410
Technique
QW420
Material Groupin
WPS NO :
SUPPORTING PQR:
WELDINGPROCESS
ELECTRICAL(QW409)
JOINT DESIGHN(QW402)
BASE METAL(QW403)
P NO TO P NO
BASE METAL DIMENTION:
BASE METAL TKH:
POSITION(QW405)
POSITION OF GROOVE:
WELDING PROGRESTION
FILLER METAL (QW404)
ROOT PASS:
OTHER PASS
PREHEAT(QW406)
TEMPRETURE MIN
INTERPASSTEMP
GAS:(QW408)
PWHT(QW407)
TEMP RANGE:
HOLDING TIME:
TECH(QW410)
STRING OR WEAVE
TRAVEL SPEED
ASME B31.3
DCEP=DirectCurretElectrodePositive
DCEN=DirectCurretElectrodeNegativeال
PNO 1 TO 11
آهنی
CS,AS,SS
PNO 21 TO 25
آلومنیم و آلیاژهای آن
P NO31 TO 35
مس و آلیاژهای آن
P NO 41 TO 47
نیکل و آلیاژهای آن
P NO 51 TO 53
تیتانیم و آلیاژ های آن
P NO 61 TO 62
زیر کونیم و آلیاژهای آن
FILLER METAL (QW404)
ROOT PASS:
SFA:
F NO:
A NO ;
OTHER PASS
برای انتخاب فیلر و الکترود باید به ASME II PART C مراجعه نمود
-ابتدا نوع فلز را با توجه به شماره SPEC آن مشخص می نماییم
(ASME II PAR A FOR FEROUS MATERIAL )
ASME II PART B FOR NON FEROUS MATERIAL
-بعد از مشخص شدن نوع متریال به فهرست ASME II PART C مراجعه و بخش
مربوطه را پیدا و فیلر و الکترود را انتخاب نمایید .
-تغییر WPS و انجام PQR مجدد:
-در صورتیکه متغیر ها ی زیر تغییر کنند نیاز به نوشتن WPS مجدد و انجام PQR دوباره می باشد.
- حذف یا اضافه شدن PWHT
- تغییر فلز پایه بر اساس P NO
- تغییر جنس فیلر یا الکترود.
– تغییر ضخامت بیشتر از دو برابر اندازه تایید شده در WPS
-فنون جوشکاری مانند Weave,String
- کاهش دمای پیش گرم بیشتر از 100 درجه فارانهایت
2 - تغییر در متغیر های زیر نیاز به تکرار WPS و انجام PQR مجدد ندارد.
-طرح اتصال
-Welding Progrestion
-قطر فیلر یا الکترود
-قطر لوله
3 - تغییر در متغیر های زیر در صورتیکه آزمایش ضربه نیاز باشد منجر به تکرار WPS و انجام مجدد PQR
خواهد شد.
-افزایش در گرمای ورودی
- تغییر در قطبیت جریان
به متغیر های گروه اول ضروری , گروه دوم غیر ضروری و گروه سوم متغیر های مکمل می گویند .
ASME IX ARTICLE II QW252-264 برای همه روش های جوشکاری این مورد را بیان کرده است
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: asmeix,qw,wps,pqr,wpq,welding data,qw100,general,qw110,weld orientation,qw120,test position for groovweld,qw130,fillet weld,qw140,type and purposes of test and examination,qw150,tentiontest,qw160,guidbend test,qw170,notch toughnestest,qw180,fillet weld qw190,other test and examination,app i,round indication,chart,qw200,general,qw210,preperation of test coupon,qw250,welding variable,qw300,general,qw310,qualificatinof test,coupon,qw320,retest and renewal,of qualification,qw350,welding variable,for welder,qw360,welding variable,for welding operator,qw400,variable,qw410,technique,qw420,material groupin,wps no,supporting pqr,weldingprocess,electrical qw409,joint desighn qw402,base metal qw403,p no to p no,base metal dimention,base metal tkh,position qw405,position of groove,welding progrestion,filler metal qw404,root pass,other pass,preheat qw406,tempreture min,interpasstemp,gas qw408,pwht qw407,temp range,holding time,tech qw410,string or weave,travel speed,asme b31 3,dcep directcurretelectrodepositive,dcen directcurretelectrodenegativeال,pno 1 to 11,آهنی,cs,as,ss,pno 21 to 25,آلومنیم و آلیاژهای آن,p no31 to 35,مس و آلیاژهای آن,p no 41 to 47,نیکل و آلیاژهای آن,p no 51 to 53,تیتانیم و آلیاژ های آن,p no 61 to 62,زیر کونیم و آلیاژهای آن,filler metal qw404,root pass,sfa,f no,a no,other pass,برای انتخاب فیلر و الکترود باید به asme ii part c مراجعه نمود,ابتدا نوع فلز را با توجه به شماره spec آن مشخص می نماییم,asme ii par a for ferous material,asme ii part b for non ferous material,بعد از مشخص شدن نوع متریال به فهرست asme ii part c مراجعه و بخش,مربوطه را پیدا و فیلر و الکترود را انتخاب نمایید,تغییر wps و انجام pqr مجدد,در صورتیکه متغیر ها ی زیر تغییر کنند نیاز به نوشتن wps مجدد و انجام pqr دوباره می باشد,حذف یا اضافه شدن pwht,تغییر فلز پایه بر اساس p no,تغییر جنس فیلر یا الکترود,تغییر ضخامت بیشتر از دو برابر اندازه تایید شده در wps,فنون جوشکاری مانند weave,string,کاهش دمای پیش گرم بیشتر از 100 درجه فارانهایت,2 تغییر در متغیر های زیر نیاز به تکرار wps و انجام pqr مجدد ندارد,طرح اتصال,welding progrestion,قطر فیلر یا الکترود,قطر لوله,3 تغییر در متغیر های زیر در صورتیکه آزمایش ضربه نیاز باشد منجر به تکرار wps و انجام مجدد pqr,خواهد شد,افزایش در گرمای ورودی,تغییر در قطبیت جریان,به متغیر های گروه اول ضروری,گروه دوم غیر ضروری و گروه سوم متغیر های مکمل می گویند,asme ix article ii qw252 264 برای همه روش های جوشکاری این مورد را بیان کرده است
دانلود چک لیست پارامترهای اساسی یک wps
مختصری در باره ی مدارک جوشکاری (WPS , PQR,WPQ)
WPS: تنظیم و بررسی مدارک دستورالعمل جوشکاری
PQR : گزارش تایید دستورالعمل جوشکاری
WPQ : تایید صلاحیت جوشکار
در ایران تهیه مدارک جوشکاری در پروژه های صنعتی در بیشتر موارد بر اساس استاندارد ASME انجام می شود.
لازم است تمامی عملیات صنعتی و از جمله فعالیت های مرتبط با جوشکاری بر اساس رویه های تدوین شده صورت پذیرد.بر این اساس برای انجام هر پروژه ,دستورالعمل اجرایی تهیه می گردد و پس از آن با انجام آزمایش هایی قابلیت اجرایی دستورالعمل و توانایی تحقق خواسته ها به اثبات می رسد.
WPS یک دستورالعمل نوشته شده است که مسیر را برای جوشکار در اجرای جوشکاری بر اساس کد یا استاندارد مورد نظر مشخص می کند.تصویب WPS تنها خصوصیات جوش را تضمین می کند نه مهارت جوشکار یا اپراتور جوشکاری را.
مدارک می بایست بر اساس نیاز های کارفرما و بنا به تایید مشاور طرح , توسط سازنده(پیمانکار) تهیه شود.
هدف تمامی استانداردها یکسان و ایجاد اطمینان از کیفیت جوشکاری است و در واقع نیاز به اطمینان از کیفیت سازه های جوشکاری شده,اساس گسترش بسیاری از استاندارد ها در این زمینه بوده است.
تهیه مدرک WPS در ASME مشخص کننده جزییات فرآیند جوشکاری قطعه مورد نظر است.دستورالعمل جوشکاری در حقیقت از پیش مقادیر و محدوده تغییرات پارامتر های دخیل در جوشکاری را مشخص و مشخصات مواد مورد جوشکاری را نیز در بر دارد.بنابر این یک دستورالعمل جوشکاری کنترل کننده و متضمنکیفیت قطعه جوشکاری شده است.ذکر نوع وترکیب شیمیایی فلز مورد جوشکاری از جمله مهم ترین مطالب قابل ذکر در WPS می باشد و این امر در انتخاب سایر مشخصات فر آیند جوشکاری از قبیل پیش گرم کردن , پس گرمایی , انتخاب الکترود و تکنیک کار دخیل است . شرط لازم برای آغاز هر فعالیت جوشکاری,در دست داشتن WPS است.
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: مختصری,مدارک جوشکاری,wps,pqr,wpq,wps تنظیم و بررسی مدارک دستورالعمل جوشکاری,pqr گزارش تایید دستورالعمل جوشکاری,wpq تایید صلاحیت جوشکار,دستورالعمل اجرایی,کارفرما,تایید مشاور طرح,توسط سازنده پیمانکار,ترکیب شیمیایی فلز,پیش گرم کردن,پس گرمایی,انتخاب الکترود,تکنیک کار,wps amp pqr check list,paragraph,smaw saw gmaw,fcaw,gtaw,qw 402 joints,in groove design,of backing in single sided weld,of backing and chemical composition,in root spacing,nonfusing retainers,qw 403 base metal,in group number qw 422,t limits impact,t t limits gt 8 in 203 mm,t qualified,t pass gt 1 2 in 13 mm,t limits qualified short circuit arc,p n qualified,p n 5 9 10,qw 404 filler metals,size,f n,a n,diameter,diameter gt 1 4 in 6 mm,flux wire classification,alloy flux,aws classification,filler,consumable insert,filler metal product form solid metal or flux cored,supplemental filler metal,supplemental powder filler metal,gt supplemental powder filler metal,alloy elements,flux designation,t limits short circuit arc,aws classification,flux type,flux wire classification,recrushed slag,flux,qw 405 positions,position,position,vertical welding,qw 406 preheat,decrease gt 100 f 56 c,preheat maintenance,increase gt 100 f 56 c ip,wps amp pqr check list,paragraph,smaw saw gmaw,fcaw,gtaw,qw 407 pwht,pwht,pwht time amp temperature range,t limits,qw 408 gas,trailing or composition,quot single,mixture or quot,flow rate,or backing flow,backing or composition,shielding or trailing,qw 409 electrical characteristics,gt heat input,transfer mode,pulsing i,current or polarity,i amp range,tungsten electrode,qw 410 technique,string weave,quot orifice cup,or nozzle size quot,method of cleaning,method of back gouge,oscillation,tube to work distance,multi to single pass per side,single to multi electrodes,closed to out of chamber welding,electrode spacing,manual or automatic,peening,legend,addition,deletion,gt increase greater than,lt decrease less than,uphill,downhill,forehand,backhand,change,e essential variables which must be indicated on both the wps and recorded on the pqr any changes to these variables,require requalification of wps,s supplementary essential variables must be indicated on the wps and recorded on the pqr when impact testing is,required changes to these variables when impact testing is performed require requalification of wps,n nonessential variables must be indicated on the wps but when changed do not require requalification of wps,quot note wps s are to indicate all essential,nonessential and supplementary essential variables do quot,not indicate variables which are not used as na they are applicable and should be entered on,the wps as none or not used
دانلود رایگان کتاب فهرست واژگان و کلمات اختصاری ابزار دقیق
فهرست واژگان و کلمات اختصاری ابزار دقیق
Free Download
NO ABBRA. DESCRIPTION
ADV AUTOMATIC DELUGEVALVE
AS AIRSUPPLY
ASC ALARMSWITCH CALIBRATION CERTIFICATE
AT ANALYZER TRANSMITTER
AV ANALYZER VALVE
B.V BYVENDOR
BDV BLOW DOWN VALVE
BE FLAME DETECTOR
BI BURNERIGNITER
CAB CABINET
CAD COMPUTER AIDED DESIGN
CP CORROSION PROBE
CV CONTROL VALVE
DCS DISTRIBUTECONTROL SYSTEM
DGC GAS DETECTOR POINT TYPE - DUTY : FREESPACE - COMBUSTIBLE
DGCR GAS DETECTORRESERVE LINEOFSIGHT/OPEN PATHCOMBUSTIBLE
DGCT GAS DETECTORTRANSMITTER LINE OF SIGHT/OPEN PATH
COMBUSTIBLE
DGT TOXICGAS DETECTOR
DIS DIGITAL ALARMSOUNDER
DPT D/P TRANSMITTER
E ELEMENT THERMOCOUPLE, RTD
EBD EMERGENCY BLOW DOWNSYSTEM WHICH IS INCLUDEDINESD SYSTEM
EBDV EMERGENCYBLOW - DOWN VALVE
EDP EMERGENCY DEPRESSURIZING SYSTEM WHICH IS INCLUDED IN ESD
SYSTEM
EDPV EMERGENCYDEPRESSURIZING VALVE
EL ELEVATION
ENG ENERGIZED
ESD EMERGENCY SHUTDOWN SYSTEM WHICH IS PLC
ESDV EMERGENCYSHUTDOWNVALVE
EWS ENGINEERING WORKSTATION
F&G FIRE & GASSYSTEM
F.G.L FINISHEDGRADELEVEL
F.O FIBEROPTIC
F.O.C FIBER OPTICCABLE
FA FLAME ARRESTER
FAT FACTORY ACCEPTANCE TEST
FAT TRIPALARM
FC FLOW CONTROLLER
FCS FIELDCONTROLSYSTEM
FDS FUNCTION DESIGN SPECIFICATION
FE FLOW ELEMENT ORIFICE PLATEASSEMBLY
FGD FIR, SMOKE, FLAME, HEAT MANUAL, ALARM CONTACT AND
ITCHEDEVICEDETECTOR AND ZONE LOOP ACCEPTANCE
FGH REMOTE HALONINDICATOR ACCEPTANCE CERTIFICATE
FI FLOW INDICATOR
FIC FLOW INDICATOR CONTROLLER
FIS FLOW INDICATOR SWITCH
FMI FIELDMOUNTEDINSTRUMENT INSPECTION
FS FLOW SWITCH
FT FLOW TRANSMITTER
FV FLOW VALVE
FY I/PCONVERTER
GT GASDETECTOR
H.P.P HIGH POINTPAVING
H.V.A.C HEAT VENTILATORAIR-CONDITION
H.W.C HARD WIRE CABLE
HIPS HIGHINTEGRITY PROTECTION SYSTEM
HIPV HIGHINTEGRITY PROTECTION VALVE
HPV HIGH POINTVENT
HS HAND SWITCH SELECTOR SWITCH
HV HAND OPERATED VALVE
HXB HORNS/ALARM BELLS
I LOCAL INDICATOR
I.S INST SIGNAL
I/O INPUT / OUTPUT
IAS INSTRUMENTAIR SUPPLY
IAS INSTRUMENTAIR SUPPLY TEST REPORT
IISCS MISCELLANEOUS
ILA INSTRUMENT LOOPACCEPTANCE
ILI INSTRUMENT LOOPINTERIM INSPECTION
ILP IMPULSE LINE PRESSURE TEST REPORT
IPT INSTRUMENTPIPING AND TUBING INSPECTION
IS GROUNDING BUS BARFOR INTRINSICSAFETY
IS INTRINSICALLY SAFE
JBI INSTALLATION ANDINSPECTIONFOR JUNCTION BOX
L.C LOCKED CLOSE
L.O LOCK OPEN
L.O LOCKED OPEN
LAB LABORATORY
LCP LOCALCONTROLPANEL
LCR LOCALCOMPRESSORROM
LDC LEVELDISPLACEMENT CALIBRATIONCERTIFICATE
LER LOCALEQUIPMENT ROOM
LG LEVEL GAUGE
LI LEVEL INDICATOR
LP LOCAL CONTROL PANEL
LS LEVEL SWITCH
LT LEVEL TRANSMITTER
LT-G TANKLEVEL GAUGE
LV LEVEL VALVE
LY I/PCONVERTER
M MISCELLANEOUS
MCC MOTORCONTROLCENTER
MCT MULTICORETRANSIT
MET METERING SYSTEM
MMI MAN MACHININTERFACE
MOV MOTOROPERATED VALVE
MRU MERCAPTAN REMOVAL UNIT
MSH MAIN SWITCH HOUSE
MZ LIMIT SWITCH
MZLC LIMIT SWITCHCLOSE
MZLO LIMIT SWITCHOPEN
N.C NORMALLY CLOSE
N.O NORMALLY OPEN
NIS GROUNDING BUSBAR FOR NON INTRINSIC SAFETY
P.B. PUSHBUTTON
P.O. POSITIONER OUTPUT
PAH PRESSURE ALARM HIGH
PAL PRESSURE ALARM LOW
PCR PROCESS CONTROL ROOM
PCV PRESSURE REGULATOR
PD PIGDETECTOR
PDAH PRESSURE DIFFERENTIALALARM HIGH
PDB POWER DISTRIBUTIONBOARD
PDG PRESSURE DIFFERENTIAL GAUGE
PDI PRESSURE RECEIVER GAUGE
PDSH PRESSURE DIFFERENTIALSWITCH HIGH
PDT D/P TRANSMITTER PRESSURE
PG PRESSURE GAUGE
PI PRESSURE INDICATOR
PLC PROGRAMMABLE LOGIC CONTROLLER
PMS POWER MANAGEMENT SYSTEM
PMS PUMP MANAGEMENT SYSTEM
PNL GROUNDING BUSBAR FOR PANEL
PS PRESSURE SWITCH
PSH PRESSURE SWITCH HIGH
PSL PRESSURE SWITCH LOW
PSV PRESSURE SAFETY RELIFEVALVE
PT PRESSURE TRANSMITTER
PT PRESSURE TRANSMITTER
PT PLATINUM OHM
PV PRESSURE VALVECONTROLVALVE
PVSV VACUUM RELIEF VALVE
PY I/PCONVERTER
R SOLENOID VALVE
R.L. REFERENCELEVEL
R.T.D. RESISTANCETEMPERATURE DETECTOR
RO RESTRICTIONORIFICE
S SWITCH FLOW, LEVEL,PRESSER, TEMPPUSH BUTTON
S.W.I.P. SEA WATER INTAKE PLAN
SAT SITE ACCEPTANCE TEST
SDV SHUT DOWN VALVE
SO SOLENOID VALVE
SQL STRUCTURE QUERY LANGUAGE
STR STRAINER
T TRANSMITTER
T/B TERMINAL BOX
TCU THYRISTOR CONTROL UNIT
TE TEMPERATURETRUE ELEMENT THERMOCOUPLE
TE THERMOCOUPLE
TG TEMPERATUREGAGE
TGS TANK GAUGING SYSTEM
TI TEMP. RECEIVERGAGE
TS TEMP. SWITCH
TT TEMP. TRANSMITTER
TV TEMP. VALVE CONTROL VALVE
TW TERMOWELL
TY I/PCONVERTER
UCM MERCAPTAN REMOVAL UNIT/ SEQUENCE CONTROL MRU PLC
UCP UNITCONTROLMODULE SWITCHISPLC SEQUENCE CONTROLFOR
MERCAPTANREMOVALUNIT
UCR UTILITY CONTROL ROOM
UPS UN- INTERRUPTIBLE POWERSUPPLY
VA PNEUMATIC VALVE POSITIONER
VB ELECTRIC VALVEPOSITIONER
VSH VIBRATION SWITCH
W LIMIT POSITION SWITCH
WS WORK STATION
WT WEATHER STATION
XA ALARM OVERRIDE
XL LIGHT
XV ON/OF VALVE SEQUENCE VALVE
XV SEQUENCE VALVE
Y RELAY I/P , P/I,CONVERTER , ETC
ZA POSITION ALARM
ZL INDICATOR
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: دانلود,دانلود رایگان,فهرست واژگان و کلمات اختصاری ابزار دقیق,Free Download,NO ABBRA DESCRIPTION,ADV AUTOMATIC DELUGEVALVE,AS AIRSUPPLY,ASC ALARMSWITCH CALIBRATION CERTIFICATE,AT ANALYZER TRANSMITTER,AV ANALYZER VALVE,B V BYVENDOR,BDV BLOW DOWN VALVE,BE FLAME DETECTOR,BI BURNERIGNITER,CAB CABINET,CAD COMPUTER AIDED DESIGN,CP CORROSION PROBE,CV CONTROL VALVE,DCS DISTRIBUTECONTROL SYSTEM,DGC GAS DETECTOR POINT TYPE DUTY FREESPACE COMBUSTIBLE,DGCR GAS DETECTORRESERVE LINEOFSIGHT OPEN PATHCOMBUSTIBLE,DGCT GAS DETECTORTRANSMITTER LINE OF SIGHT OPEN PATH,COMBUSTIBLE,DGT TOXICGAS DETECTOR,DIS DIGITAL ALARMSOUNDER,DPT D P TRANSMITTER,quot E ELEMENT THERMOCOUPLE,RTD quot,EBD EMERGENCY BLOW DOWNSYSTEM WHICH IS INCLUDEDINESD SYSTEM,EBDV EMERGENCYBLOW DOWN VALVE,EDP EMERGENCY DEPRESSURIZING SYSTEM WHICH IS INCLUDED IN ESD,SYSTEM,EDPV EMERGENCYDEPRESSURIZING VALVE,EL ELEVATION,ENG ENERGIZED,ESD EMERGENCY SHUTDOWN SYSTEM WHICH IS PLC,ESDV EMERGENCYSHUTDOWNVALVE,EWS ENGINEERING WORKSTATION,F amp G FIRE amp GASSYSTEM,F G L FINISHEDGRADELEVEL,F O FIBEROPTIC,F O C FIBER OPTICCABLE,FA FLAME ARRESTER,FAT FACTORY ACCEPTANCE TEST,FAT TRIPALARM,FC FLOW CONTROLLER,FCS FIELDCONTROLSYSTEM,FDS FUNCTION DESIGN SPECIFICATION,FE FLOW ELEMENT ORIFICE PLATEASSEMBLY,quot FGD FIR,SMOKE,FLAME,HEAT MANUAL,ALARM CONTACT AND quot,ITCHEDEVICEDETECTOR AND ZONE LOOP ACCEPTANCE,FGH REMOTE HALONINDICATOR ACCEPTANCE CERTIFICATE,FI FLOW INDICATOR,FIC FLOW INDICATOR CONTROLLER,FIS FLOW INDICATOR SWITCH,FMI FIELDMOUNTEDINSTRUMENT INSPECTION,FS FLOW SWITCH,FT FLOW TRANSMITTER,FV FLOW VALVE,FY I PCONVERTER,GT GASDETECTOR,H P P HIGH POINTPAVING,H V A C HEAT VENTILATORAIR CONDITION,H W C HARD WIRE CABLE,HIPS HIGHINTEGRITY PROTECTION SYSTEM,HIPV HIGHINTEGRITY PROTECTION VALVE,HPV HIGH POINTVENT,HS HAND SWITCH SELECTOR SWITCH,HV HAND OPERATED VALVE,HXB HORNS ALARM BELLS,I LOCAL INDICATOR,I S INST SIGNAL,I O INPUT OUTPUT,IAS INSTRUMENTAIR SUPPLY,IAS INSTRUMENTAIR SUPPLY TEST REPORT,IISCS MISCELLANEOUS,ILA INSTRUMENT LOOPACCEPTANCE,ILI INSTRUMENT LOOPINTERIM INSPECTION,ILP IMPULSE LINE PRESSURE TEST REPORT,IPT INSTRUMENTPIPING AND TUBING INSPECTION,IS GROUNDING BUS BARFOR INTRINSICSAFETY,IS INTRINSICALLY SAFE,JBI INSTALLATION ANDINSPECTIONFOR JUNCTION BOX,L C LOCKED CLOSE,L O LOCK OPEN,L O LOCKED OPEN,LAB LABORATORY,LCP LOCALCONTROLPANEL,LCR LOCALCOMPRESSORROM,LDC LEVELDISPLACEMENT CALIBRATIONCERTIFICATE,LER LOCALEQUIPMENT ROOM,LG LEVEL GAUGE,LI LEVEL INDICATOR,LP LOCAL CONTROL PANEL,LS LEVEL SWITCH,LT LEVEL TRANSMITTER,LT G TANKLEVEL GAUGE,LV LEVEL VALVE,LY I PCONVERTER,M MISCELLANEOUS,MCC MOTORCONTROLCENTER,MCT MULTICORETRANSIT,MET METERING SYSTEM,MMI MAN MACHININTERFACE,MOV MOTOROPERATED VALVE,MRU MERCAPTAN REMOVAL UNIT,MSH MAIN SWITCH HOUSE,MZ LIMIT SWITCH,MZLC LIMIT SWITCHCLOSE,MZLO LIMIT SWITCHOPEN,N C NORMALLY CLOSE,N O NORMALLY OPEN,NIS GROUNDING BUSBAR FOR NON INTRINSIC SAFETY,P B PUSHBUTTON,P O POSITIONER OUTPUT,PAH PRESSURE ALARM HIGH,PAL PRESSURE ALARM LOW,PCR PROCESS CONTROL ROOM,PCV PRESSURE REGULATOR,PD PIGDETECTOR,PDAH PRESSURE DIFFERENTIALALARM HIGH,PDB POWER DISTRIBUTIONBOARD,PDG PRESSURE DIFFERENTIAL GAUGE,PDI PRESSURE RECEIVER GAUGE,PDSH PRESSURE DIFFERENTIALSWITCH HIGH,PDT D P TRANSMITTER PRESSURE,PG PRESSURE GAUGE,PI PRESSURE INDICATOR,PLC PROGRAMMABLE LOGIC CONTROLLER,PMS POWER MANAGEMENT SYSTEM,PMS PUMP MANAGEMENT SYSTEM,PNL GROUNDING BUSBAR FOR PANEL,PS PRESSURE SWITCH,PSH PRESSURE SWITCH HIGH,PSL PRESSURE SWITCH LOW,PSV PRESSURE SAFETY RELIFEVALVE,PT PRESSURE TRANSMITTER,PT PRESSURE TRANSMITTER,PT PLATINUM OHM,PV PRESSURE VALVECONTROLVALVE,PVSV VACUUM RELIEF VALVE,PY I PCONVERTER,R SOLENOID VALVE,R L REFERENCELEVEL,R T D RESISTANCETEMPERATURE DETECTOR,RO RESTRICTIONORIFICE,quot S SWITCH FLOW,LEVEL,PRESSER,TEMPPUSH BUTTON quot,S W I P SEA WATER INTAKE PLAN,SAT SITE ACCEPTANCE TEST,SDV SHUT DOWN VALVE,SO SOLENOID VALVE,SQL STRUCTURE QUERY LANGUAGE,STR STRAINER,T TRANSMITTER,T B TERMINAL BOX,TCU THYRISTOR CONTROL UNIT,TE TEMPERATURETRUE ELEMENT THERMOCOUPLE,TE THERMOCOUPLE,TG TEMPERATUREGAGE,TGS TANK GAUGING SYSTEM,TI TEMP RECEIVERGAGE,TS TEMP SWITCH,TT TEMP TRANSMITTER,TV TEMP VALVE CONTROL VALVE,TW TERMOWELL,TY I PCONVERTER,UCM MERCAPTAN REMOVAL UNIT SEQUENCE CONTROL MRU PLC,UCP UNITCONTROLMODULE SWITCHISPLC SEQUENCE CONTROLFOR,MERCAPTANREMOVALUNIT,UCR UTILITY CONTROL ROOM,UPS UN INTERRUPTIBLE POWERSUPPLY,VA PNEUMATIC VALVE POSITIONER,VB ELECTRIC VALVEPOSITIONER,VSH VIBRATION SWITCH,W LIMIT POSITION SWITCH,WS WORK STATION,WT WEATHER STATION,XA ALARM OVERRIDE,XL LIGHT,XV ON OF VALVE SEQUENCE VALVE,XV SEQUENCE VALVE,quot Y RELAY I P,P I,CONVERTER,ETC quot,ZA POSITION ALARM,ZL INDICATOR