دانلود رایگان کتاب حفاظت در برابر ساعقه
lightning effects
Lightning and its effects
The mechanisms of lightning
The effects of lightning
Direct effects strikes on structures
Indirect effects network overvoltages
Protection against the effects of lightning
Risk analysis: numerous tools available
Protection of structures external protection
Protection systems lightning conductors
The electrogeometric model
Capture surface areas
Downconductors
Earthing system
Protection of networks and internal equipment
Active and passive protection of the installation
Lightning strike withstand of equipment
Passive protection
General architecture of the bonding system
Voltage surge protectors
Operating principle
Main technologies and characteristics
Air spark gap, surface discharge or gas discharge tube
voltage surge protectors
Voltage surge protectors with varistor
Voltage surge protectors with silicon components
Zener diodes, thyristor, etc
Main characteristics
Protection principle
Protection modes
Cascaded protection
Location of voltage surge protectors
Protected lengths
Installing voltage surge protectors
Connecting voltage surge protectors
End of life protection of voltage surge protectors
Coordinating voltage surge protectors
Selecting voltage surge protectors
The Legrand range of voltage surge protectors
Class I voltage surge protectors
Class II voltage surge protectors
Characteristics of Legrand voltage surge protectors
Modular voltage surge protectors
Proximity voltage surge protectors
Protection of telephone lines
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: دانلود رایگان کتاب حفاظت در برابر ساعقه,protection against,lightning effects,lightning and its effects,the mechanisms of lightning,the effects of lightning,direct effects strikes on structures,indirect effects network overvoltages,protection against the effects of lightning,risk analysis numerous tools available,protection of structures external protection,protection systems lightning conductors,the electrogeometric model,capture surface areas,downconductors,earthing system,protection of networks and internal equipment,active and passive protection of the installation,lightning strike withstand of equipment,passive protection,general architecture of the bonding system,voltage surge protectors,operating principle,main technologies and characteristics,air spark gap,surface discharge or gas discharge tube,voltage surge protectors,voltage surge protectors with varistor,voltage surge protectors with silicon components,zener diodes,thyristor,etc,main characteristics,protection principle,protection modes,cascaded protection,location of voltage surge protectors,protected lengths,installing voltage surge protectors,connecting voltage surge protectors,end of life protection of voltage surge protectors,coordinating voltage surge protectors,selecting voltage surge protectors,the legrand range of voltage surge protectors,class i voltage surge protectors,class ii voltage surge protectors,characteristics of legrand voltage surge protectors,modular voltage surge protectors,proximity voltage surge protectors,protection of telephone lines
دانلود انجام بازرسی فنی جوش و متریال بر اساس ASME IX ,ASMEII
QW
WPS,PQR
WPQ
Welding data
QW100:
GENERAL
QW110:
Weld orientation.
QW120
Test position for groovweld
QW130
Fillet weld
QW140
Type and purposes of test and examination
QW150
TentionTest
QW160
Guidbend test
QW170
Notch ToughnesTest
QW180
Fillet weld QW190
Other test and examination
APP I
Round indication
chart
QW200
GENERAL
QW210
PREPERATION OF TEST COUPON
QW250
Welding Variable
QW300
General
QW310
Qualificatinof test
coupon
QW320
Retest and renewal
Of Qualification
QW350
Welding Variable
For welder
QW360
Welding Variable
For welding operator
QW400
Variable
QW410
Technique
QW420
Material Groupin
WPS NO :
SUPPORTING PQR:
WELDINGPROCESS
ELECTRICAL(QW409)
JOINT DESIGHN(QW402)
BASE METAL(QW403)
P NO TO P NO
BASE METAL DIMENTION:
BASE METAL TKH:
POSITION(QW405)
POSITION OF GROOVE:
WELDING PROGRESTION
FILLER METAL (QW404)
ROOT PASS:
OTHER PASS
PREHEAT(QW406)
TEMPRETURE MIN
INTERPASSTEMP
GAS:(QW408)
PWHT(QW407)
TEMP RANGE:
HOLDING TIME:
TECH(QW410)
STRING OR WEAVE
TRAVEL SPEED
ASME B31.3
DCEP=DirectCurretElectrodePositive
DCEN=DirectCurretElectrodeNegativeال
PNO 1 TO 11
آهنی
CS,AS,SS
PNO 21 TO 25
آلومنیم و آلیاژهای آن
P NO31 TO 35
مس و آلیاژهای آن
P NO 41 TO 47
نیکل و آلیاژهای آن
P NO 51 TO 53
تیتانیم و آلیاژ های آن
P NO 61 TO 62
زیر کونیم و آلیاژهای آن
FILLER METAL (QW404)
ROOT PASS:
SFA:
F NO:
A NO ;
OTHER PASS
برای انتخاب فیلر و الکترود باید به ASME II PART C مراجعه نمود
-ابتدا نوع فلز را با توجه به شماره SPEC آن مشخص می نماییم
(ASME II PAR A FOR FEROUS MATERIAL )
ASME II PART B FOR NON FEROUS MATERIAL
-بعد از مشخص شدن نوع متریال به فهرست ASME II PART C مراجعه و بخش
مربوطه را پیدا و فیلر و الکترود را انتخاب نمایید .
-تغییر WPS و انجام PQR مجدد:
-در صورتیکه متغیر ها ی زیر تغییر کنند نیاز به نوشتن WPS مجدد و انجام PQR دوباره می باشد.
- حذف یا اضافه شدن PWHT
- تغییر فلز پایه بر اساس P NO
- تغییر جنس فیلر یا الکترود.
– تغییر ضخامت بیشتر از دو برابر اندازه تایید شده در WPS
-فنون جوشکاری مانند Weave,String
- کاهش دمای پیش گرم بیشتر از 100 درجه فارانهایت
2 - تغییر در متغیر های زیر نیاز به تکرار WPS و انجام PQR مجدد ندارد.
-طرح اتصال
-Welding Progrestion
-قطر فیلر یا الکترود
-قطر لوله
3 - تغییر در متغیر های زیر در صورتیکه آزمایش ضربه نیاز باشد منجر به تکرار WPS و انجام مجدد PQR
خواهد شد.
-افزایش در گرمای ورودی
- تغییر در قطبیت جریان
به متغیر های گروه اول ضروری , گروه دوم غیر ضروری و گروه سوم متغیر های مکمل می گویند .
ASME IX ARTICLE II QW252-264 برای همه روش های جوشکاری این مورد را بیان کرده است
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: asmeix,qw,wps,pqr,wpq,welding data,qw100,general,qw110,weld orientation,qw120,test position for groovweld,qw130,fillet weld,qw140,type and purposes of test and examination,qw150,tentiontest,qw160,guidbend test,qw170,notch toughnestest,qw180,fillet weld qw190,other test and examination,app i,round indication,chart,qw200,general,qw210,preperation of test coupon,qw250,welding variable,qw300,general,qw310,qualificatinof test,coupon,qw320,retest and renewal,of qualification,qw350,welding variable,for welder,qw360,welding variable,for welding operator,qw400,variable,qw410,technique,qw420,material groupin,wps no,supporting pqr,weldingprocess,electrical qw409,joint desighn qw402,base metal qw403,p no to p no,base metal dimention,base metal tkh,position qw405,position of groove,welding progrestion,filler metal qw404,root pass,other pass,preheat qw406,tempreture min,interpasstemp,gas qw408,pwht qw407,temp range,holding time,tech qw410,string or weave,travel speed,asme b31 3,dcep directcurretelectrodepositive,dcen directcurretelectrodenegativeال,pno 1 to 11,آهنی,cs,as,ss,pno 21 to 25,آلومنیم و آلیاژهای آن,p no31 to 35,مس و آلیاژهای آن,p no 41 to 47,نیکل و آلیاژهای آن,p no 51 to 53,تیتانیم و آلیاژ های آن,p no 61 to 62,زیر کونیم و آلیاژهای آن,filler metal qw404,root pass,sfa,f no,a no,other pass,برای انتخاب فیلر و الکترود باید به asme ii part c مراجعه نمود,ابتدا نوع فلز را با توجه به شماره spec آن مشخص می نماییم,asme ii par a for ferous material,asme ii part b for non ferous material,بعد از مشخص شدن نوع متریال به فهرست asme ii part c مراجعه و بخش,مربوطه را پیدا و فیلر و الکترود را انتخاب نمایید,تغییر wps و انجام pqr مجدد,در صورتیکه متغیر ها ی زیر تغییر کنند نیاز به نوشتن wps مجدد و انجام pqr دوباره می باشد,حذف یا اضافه شدن pwht,تغییر فلز پایه بر اساس p no,تغییر جنس فیلر یا الکترود,تغییر ضخامت بیشتر از دو برابر اندازه تایید شده در wps,فنون جوشکاری مانند weave,string,کاهش دمای پیش گرم بیشتر از 100 درجه فارانهایت,2 تغییر در متغیر های زیر نیاز به تکرار wps و انجام pqr مجدد ندارد,طرح اتصال,welding progrestion,قطر فیلر یا الکترود,قطر لوله,3 تغییر در متغیر های زیر در صورتیکه آزمایش ضربه نیاز باشد منجر به تکرار wps و انجام مجدد pqr,خواهد شد,افزایش در گرمای ورودی,تغییر در قطبیت جریان,به متغیر های گروه اول ضروری,گروه دوم غیر ضروری و گروه سوم متغیر های مکمل می گویند,asme ix article ii qw252 264 برای همه روش های جوشکاری این مورد را بیان کرده است
دانلود چک لیست پارامترهای اساسی یک wps
مختصری در باره ی مدارک جوشکاری (WPS , PQR,WPQ)
WPS: تنظیم و بررسی مدارک دستورالعمل جوشکاری
PQR : گزارش تایید دستورالعمل جوشکاری
WPQ : تایید صلاحیت جوشکار
در ایران تهیه مدارک جوشکاری در پروژه های صنعتی در بیشتر موارد بر اساس استاندارد ASME انجام می شود.
لازم است تمامی عملیات صنعتی و از جمله فعالیت های مرتبط با جوشکاری بر اساس رویه های تدوین شده صورت پذیرد.بر این اساس برای انجام هر پروژه ,دستورالعمل اجرایی تهیه می گردد و پس از آن با انجام آزمایش هایی قابلیت اجرایی دستورالعمل و توانایی تحقق خواسته ها به اثبات می رسد.
WPS یک دستورالعمل نوشته شده است که مسیر را برای جوشکار در اجرای جوشکاری بر اساس کد یا استاندارد مورد نظر مشخص می کند.تصویب WPS تنها خصوصیات جوش را تضمین می کند نه مهارت جوشکار یا اپراتور جوشکاری را.
مدارک می بایست بر اساس نیاز های کارفرما و بنا به تایید مشاور طرح , توسط سازنده(پیمانکار) تهیه شود.
هدف تمامی استانداردها یکسان و ایجاد اطمینان از کیفیت جوشکاری است و در واقع نیاز به اطمینان از کیفیت سازه های جوشکاری شده,اساس گسترش بسیاری از استاندارد ها در این زمینه بوده است.
تهیه مدرک WPS در ASME مشخص کننده جزییات فرآیند جوشکاری قطعه مورد نظر است.دستورالعمل جوشکاری در حقیقت از پیش مقادیر و محدوده تغییرات پارامتر های دخیل در جوشکاری را مشخص و مشخصات مواد مورد جوشکاری را نیز در بر دارد.بنابر این یک دستورالعمل جوشکاری کنترل کننده و متضمنکیفیت قطعه جوشکاری شده است.ذکر نوع وترکیب شیمیایی فلز مورد جوشکاری از جمله مهم ترین مطالب قابل ذکر در WPS می باشد و این امر در انتخاب سایر مشخصات فر آیند جوشکاری از قبیل پیش گرم کردن , پس گرمایی , انتخاب الکترود و تکنیک کار دخیل است . شرط لازم برای آغاز هر فعالیت جوشکاری,در دست داشتن WPS است.
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: مختصری,مدارک جوشکاری,wps,pqr,wpq,wps تنظیم و بررسی مدارک دستورالعمل جوشکاری,pqr گزارش تایید دستورالعمل جوشکاری,wpq تایید صلاحیت جوشکار,دستورالعمل اجرایی,کارفرما,تایید مشاور طرح,توسط سازنده پیمانکار,ترکیب شیمیایی فلز,پیش گرم کردن,پس گرمایی,انتخاب الکترود,تکنیک کار,wps amp pqr check list,paragraph,smaw saw gmaw,fcaw,gtaw,qw 402 joints,in groove design,of backing in single sided weld,of backing and chemical composition,in root spacing,nonfusing retainers,qw 403 base metal,in group number qw 422,t limits impact,t t limits gt 8 in 203 mm,t qualified,t pass gt 1 2 in 13 mm,t limits qualified short circuit arc,p n qualified,p n 5 9 10,qw 404 filler metals,size,f n,a n,diameter,diameter gt 1 4 in 6 mm,flux wire classification,alloy flux,aws classification,filler,consumable insert,filler metal product form solid metal or flux cored,supplemental filler metal,supplemental powder filler metal,gt supplemental powder filler metal,alloy elements,flux designation,t limits short circuit arc,aws classification,flux type,flux wire classification,recrushed slag,flux,qw 405 positions,position,position,vertical welding,qw 406 preheat,decrease gt 100 f 56 c,preheat maintenance,increase gt 100 f 56 c ip,wps amp pqr check list,paragraph,smaw saw gmaw,fcaw,gtaw,qw 407 pwht,pwht,pwht time amp temperature range,t limits,qw 408 gas,trailing or composition,quot single,mixture or quot,flow rate,or backing flow,backing or composition,shielding or trailing,qw 409 electrical characteristics,gt heat input,transfer mode,pulsing i,current or polarity,i amp range,tungsten electrode,qw 410 technique,string weave,quot orifice cup,or nozzle size quot,method of cleaning,method of back gouge,oscillation,tube to work distance,multi to single pass per side,single to multi electrodes,closed to out of chamber welding,electrode spacing,manual or automatic,peening,legend,addition,deletion,gt increase greater than,lt decrease less than,uphill,downhill,forehand,backhand,change,e essential variables which must be indicated on both the wps and recorded on the pqr any changes to these variables,require requalification of wps,s supplementary essential variables must be indicated on the wps and recorded on the pqr when impact testing is,required changes to these variables when impact testing is performed require requalification of wps,n nonessential variables must be indicated on the wps but when changed do not require requalification of wps,quot note wps s are to indicate all essential,nonessential and supplementary essential variables do quot,not indicate variables which are not used as na they are applicable and should be entered on,the wps as none or not used