دانلود طراحی پایپینگ و ابزار دقیق
This book contains piping and instrumentation drawings
(P&IDs) representing Aspen Icarus Volumetric Models.
Volumetric Models develop material quantities and are based
on recognized design methods and construction standards.
Volumetric Models are the key components behind Aspen
Icarus’ unique method of designing and estimating.
Volumetric Models determine the field materials (type,
quantity, weights, and sizes) required to install an equipment
item. Volumetric Models generate the material takeoff for
equipment handling and setting, piping, civil, structural steel,
instrumentation, electrical, insulation and paint materials. For
example, a tower’s pipe diameter and length is determined by
the diameter, height, pressure, temperature, number of trays,
and estimated flow rates. Each run of pipe is consistent with
the tower materials, and of a specific length, diameter,
schedule, valve, and fitting count, etc., to fulfill the
functionality assigned to that line of pipe. Thus, the Volumetric
Models create materials to be installed.
P&IDs come in either a standard (STD) or a more fully
instrumented (FULL) configuration that may be specified at the
Project and Area levels. Both the standard and full versions are
shown in this book. The 600 series drawings represent the full
versions.
How Project Instrumentation is Developed
Aspen Icarus systems develop the cost of project
instrumentation based upon the direct costs of materials and
manpower for the following major items:
· Primary element hook-up
· Signal transmission
· Field/panel hook-up
· Final element hook-up
· Control Center
· Operator Center
Primary Element Hook-Up
The primary element is a field-mounted component with all the
necessary accessories for process connection and signal
transmission to a centrally located field junction box. For
pneumatic systems, it includes all the piping, tubing, fittings,
valves, and filter-regulators necessary for connecting the
impulse piping and air supply to the transmitter, and the
process signal tubing to the field junction box. Aspen Icarus
systems group this process signal tubing into one or more field
junction boxes. For electronic systems, the system assumes a
two-wire control loop where power for the transmitter is taken
from a power supply in the Control Center. A 4-20 ma DC
signal is assumed. Aspen Icarus systems calculate material and
manpower costs for fabricating and installing all pipe, valves,
and fittings for the impulse piping connection to the
transmitter, and all wiring and electrical fittings to the field
junction box. Single or multiple twisted pairs of insulated
Drawings
Symbols
Abbreviations
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: kettle reboiler,horizontal jacketed pressure vessel continuous,horizontal pressure vessel continuous,horizontal jacketed pressure vessel batch,horizontal pressure vessel batch,vertical jacketed pressure vessel batch,vertical pressure vessel batch,vertical jacketed pressure vessel continuous,vertical pressure vessel continuous,utility boiler unit,a utility boiler unit,b utility boiler unit,c utility boiler unit,compressor,a compressor,air cooled heat exchanger,horizontal jacketed pressure vessel receiver,horizontal pressure vessel receiver,vertical jacketed pressure vessel receiver,vertical pressure vessel receiver,shell amp tube heat exchanger,process heater furnace,waste heat boiler,water chiller,cooling tower,motor driven centrifugal pump,turbine gt hp kw,storage vessel,horizontal jacketed pressure vessel storage,horizontal pressure vessel storage,vertical jacketed pressure vessel storage,vertical pressure vessel storage,pumps gear amp positive displacement,reciprocating compressor,horizontal jacketed pressure vessel knockout,horizontal pressure vessel knockout,vertical jacketed pressure vessel knockout,vertical pressure knockout,enclosed jacket reactor continuous,open top jacket reactor continuous,refrigeration compressor,vessel heater,motor driven in line pump,particulate scrubber,screw conveyor,plate and frame filter,water sealed vacuum pump,fans and blowers,cloth bay baghouse dust collector,cyclone dust collector,live bottom bin,cone bottom vessel,centrifuge precipitator,horizontal plate filter,automatic batch centrifuge,manually operated centrifuge,fabric cartridge filter,tubular fabric filter,smokeless flare,ddt gas adsorption service,tower gas adsorption service,ddt liquid adsorption service,tower liquid adsorption service,ddt extraction service,tower extraction service,ddt absorber service,tower absorber service,ddt stripper with therm rb,icarus piping and instrumentation drawings,tower stripper with therm rb,ddt desorber service,tower desorber service,horizontal thermosiphon reboiler,vertical thermosiphon reboiler,ddt distillation with therm rb,tower distillation with therm rb,continuous centrifuge,mill,liquid cyclone separator,flotation cell,conditioning cell,crusher,scale,turbine lt hp kw,enclosed reactor vessel continuous,open top reactor vessel continuous,non smokeless flare,ddt distillation with kettle rb,tower distillation with kettle rb,ddt stripper with kettle rb,tower stripper with kettle rb,air compressor,reactor vessel batch,a reactor vessel batch,b reactor vessel batch,c reactor vessel batch,d reactor vessel batch,motor driven magnetic drive pipe,rectangular tile chest,cylindrical tile chest,vibrating pressure screen,bow screen low consistency stock screen,deflaker,refiner,static mixer,off machine pulper,on machine pulper,rotary blender,culinary air filter,culinary sterile steam filter f,sanitary pipe filter,sanitary pipe strainer,sanitary filter press,in line metal trap,fluming reclaim reel,shear pump homogenizer,homogenizer piston head,high speed mixer norman,rotary bowl mixer blender,kettle blender without steam jacket,horizontal ribbon blender,jacket horizontal ribbon blender,reversing anchor agitator,double motion agitator,fluming pump,air diaphragm sanitary pump,sanitary rotary lobe pump,sanitary centrifugal pump with flow control,jacket sanitary horizontal tank,sanitary horizontal tank,jacket sanitary vertical tank atmospheric surge,sanitary vertical tank atmospheric surge,jacket sanitary vertical tank atmospheric mixing,sanitary vertical tank atmospheric mixing,super sack unloader with screw conveyor discharge,super sack unloader with pneumatic conveyance discharge,container dumper column,container dumper hydraulic drum,container dumper hydraulic bin,double pipe corrugated exchanger,direct steam injection dsi exchanger,plate amp frame multizone heat exchanger,fluming dewatering shaker,icarus piping and instrumentation drawings,sanitary screw feeder,rotary drum cooker cooler,gas turbine with combustion chamber,horizontal jacketed pressure vessel with boot,horizontal pressure vessel with boot,kettle reboiler,horizontal jacketed pressure vessel continuous,horizontal pressure vessel continuous,vertical jacketed pressure vessel continuous,vertical pressure vessel continuous,air cooled heat exchanger,shell amp tube heat exchanger,process heater furnace,water chiller,cooling tower,motor driven centrifugal pump,motor driven spare centrifugal pump,horizontal jacketed pressure vessel storage,horizontal pressure vessel storage,vertical jacketed pressure vessel storage,vertical pressure vessel storage,reciprocating compressor,horizontal jacketed pressure vessel knockout,horizontal pressure vessel knockout,vertical jacketed pressure vessel knockout,vertical pressure vessel knockout,enclosed jacket reactor continuous,motor driven in line pump,ddt distillation with therm rb,tower distillation with therm rb,enclosed reactor vessel continuous,open top reactor vessel continuous,ddt distillation with kettle rb,tower distillation with kettle rb,motor driven magnetic drive pump,ac see air compressors ac,agitated tanks at,cond cell,float cell,mach pulp,mixer,off mach,open top,reactor,air compressor,air compressors ac,centrif m,centrif t see drawings and for turbines,recip gas,recip motor,single s,single s,air cooled heat exchanger,air diaphragm sanitary pump,at see agitated tanks at,automatic batch centrifuge,bl see blenders bl,blenders bl,rotary,boiler unit,bow screen low consistency stock screen,c see condensers c,centrifugal pumps cp,ansi,ansi plast,api,axial flow,canned,centrif,flume pump,gen serve,in line,mag drive,icarus piping and instrumentation drawings,san pump,centrifuge precipitator,centrifuges ct,atm suspen,batch auto,batch botm,batch top,bot unload,screen bwl continuous,solid bowl,top unload,vibratory continuous,cloth bay baghouse dust collector,co see conveyors co,compressor,condensers c,barometric,conditioning cell,cone bottom vessel,container dumper column,container dumper hydraulic bin,container dumper hydraulic drum,continuous centrifuge,conveyors co,screw,cooling tower,cooling towers ctw,cooling,cooling wp,cp see centrifugal pumps cp,cr see crushers cr,crusher,crushers cr,cone,gyratory,ct see centrifuges ct,ctw see cooling towers ctw,culinary sterile steam filter f,culinary air filter,cyclone dust collector,cylindrical tile chest,dc see dust collectors dc,ddt see double diameter towers ddt packed trayed,ddt absorber service,ddt desorber service,ddt distillation with kettle rb,ddt distillation with therm rb,ddt extraction service,ddt gas adsorption service,ddt liquid adsorption service,ddt stripper with kettle rb,ddt stripper with therm rb,deflaker,direct steam injection dsi exchanger,double diameter towers ddt packed trayed,adsorber,desorber,distillation with kettle reboiler,distillation with therm reboiler,extraction,gas adsorption,liquid adsorption,stripper with kettle reboiler,stripper with therm reboiler,double motion agitator,double pipe corrugated exchanger,dust collectors dc,centrif pre,cloth bay,cyclone,mult cyclo,pulse shkr,washers,enclosed jacket reactor continuous,icarus piping and instrumentation drawings,enclosed reactor vessel continuous,extraction service,double diameter tower,single diameter tower,f see filters f,fabric cartridge filter,fans fn,centrif,propeller,rot blower,vaneaxial,fans and blowers,field erected boiler unit,filters f,cartridge,plate frame,san air,san press,san steam,san strain,sparkler,tubular,flares flr,derrick non smokeless,derrick smokeless,guyed non smokeless,guyed smokeless,horizontal non smokeless,horizontal smokeless,self supp non smokeless,self supp smokeless,flotation cell,flr see flares flr,fluming dewatering shaker,fluming pump,fluming reclaim reel,fn see fans fn,fu see furnaces fu,furnaces fu,box,heater,pyrolysis,reformer,vertical,gas adsorption service,double diameter tower,single diameter tower,gas compressors gc,centrif see drawings and for turbines,recip gas see,recip motor see,gas turbine with combustion chamber,gc see gas compressors gc,gear pumps gp,canned rtr,gear,mech seal,gp see gear pumps gp,he see heat exchangers he,heat exchangers he,air cooled,corrugated,hot water,multi pf,shell tube see drawing for instrumentation,stm he mod,waste heat,high speed mixer norman,homogenizer piston head,horizontal jacketed pressure vessel batch,horizontal jacketed pressure vessel continuous,horizontal jacketed pressure vessel continuous,horizontal jacketed pressure vessel knockout,horizontal jacketed pressure vessel receiver,icarus piping and instrumentation drawings,horizontal jacketed pressure vessel storage,horizontal jacketed pressure vessel with boot,horizontal plate filter,horizontal pressure vessel batch,horizontal pressure vessel continuous,horizontal pressure vessel knockout,horizontal pressure vessel receiver,horizontal pressure vessel storage,horizontal pressure vessel with boot,horizontal ribbon blender,horizontal tanks ht,horiz drum batch,horiz drum continuous,horiz drum receiver,horiz drum storage,jacketed batch,jacketed continuous,jacketed receiver,jacketed storage,horizontal thermosiphon reboiler,hotwater set with shell amp tube heat exchanger,ht see horizontal tanks ht,in line metal trap,jacket horizontal ribbon blender,jacket sanitary horizontal tank,jacket sanitary vertical tank atmospheric mixing,jacket sanitary vertical tank atmospheric surge,kettle blender with steam jacket,kettle blender without steam jacket,kettle reboiler,liquid adsorption service,double diameter tower,single diameter tower,liquid cyclone separator,live bottom bin,m see mills m,manually operated centrifuge,mill,mills m,autogenous,ball mill,rod mill,mixers mx,static,motor driven centrifugal pump,motor driven in line pump,motor driven magnetic drive pipe,motor driven magnetic drive pump,motor driven spare centrifugal pump,mx see mixers mx,non smokeless flare,off machine pulper,on machine pulper,open top jacket reactor continuous,open top reactor vessel continuous,packaged boiler unit,particulate scrubber,plate amp frame multizone heat exchanger,plate and frame filter,precipitator centrifuge,pressure screen,process heater furnace,pumps gear amp positive displacement,rb see reboilers rb,reactor vessel batch,reboilers rb,kettle,thermosiph horizontal,thermosiph vertical,reciprocating compressor,rectangular tile chest,refrigeration compressor,icarus piping and instrumentation drawings,refrigeration units ru,cent compr,mechanical,reversing anchor agitator,rotary blender,rotary bowl mixer blender,rotary drum cooker cooler,ru see refrigeration units ru,s see scales s,sanitary centrifugal pump with flow control,sanitary direct steam heat module,sanitary double pipe corrugated exchanger,sanitary filter press,sanitary floor scale,sanitary horizontal tank,sanitary multi zone plate amp frame exchanger,sanitary pipe filter,sanitary pipe strainer,sanitary rotary lobe pump,sanitary screw feeder,sanitary vertical tank atmospheric mixing,sanitary vertical tank atmospheric mixing,sanitary vertical tank atmospheric surge,sanitary vertical tank atmospheric surge,sanitary weight belt feeder,scale,scales s,belt,san floor,track,truck,screens vs,pressure,stock,screw conveyor,scrubber particulate,se see separation equipment se,separation equipment se,water cycl,shear pump homogenizer,shell amp tube heat exchanger,single diameter towers tw packed trayed,absorber,desorber,distillation with kettle reboiler,distillation with therm reboiler,extraction,gas adsorption,liquid adsorption,stripper with kettle reboiler,stripper with therm reboiler,smokeless flare,st see stock treatments st,static mixer,stb see steam boilers stb,steam boilers stb,boiler,stm boiler,stock treatments st,deflaker cn,deflaker dk,refiner,storage vessel,super sack unloader with pneumatic conveyance discharge,super sack unloader with screw conveyor discharge,tower absorber service,tower desorber service,tower distillation with kettle rb,tower distillation with therm rb,tower extraction service,tower gas adsorption service,tower liquid adsorption service,tower stripper with kettle rb,tower stripper with therm rb,icarus piping and instrumentation drawings,tubular fabric filter,tur see turbines tur,turbine lt hp kw,turbine gt hp kw,turbines tur,condensing,gas,non cond,tw see single diameter towers tw packed trayed,utility boiler unit,vacuum pumps vp,mech boost,mechanical,water seal,vertical jacketed pressure vessel batch,vertical jacketed pressure vessel continuous,vertical jacketed pressure vessel knockout,vertical jacketed pressure vessel receiver,vertical jacketed pressure vessel storage,vertical pressure knockout,vertical pressure vessel batch,vertical pressure vessel continuous,vertical pressure vessel knockout,vertical pressure vessel receiver,vertical pressure vessel storage,vertical tanks vt,jacketed batch,jacketed continuous,jacketed knockout,jacketed receiver,jacketed storage,multi wall batch,multi wall continuous,multi wall knockout,multi wall receiver,multi wall storage,san tank,storage,wood tank,vertical thermosiphon reboiler,vessel heater,vibrating pressure screen,vp see vacuum pumps vp,vs see screens vs,vt see vertical tanks vt,waste heat boiler,water chiller,water sealed vacuum pump
دانلود رایگان کتاب اندازه گیری فشار،دما و جریان سیال
برای دانلود روی لینک زیر کلیک نمائید:
دانلود
شامل:
اندازه گيری فشار
Pressure Measurement
انواع اندازه گيري فشار
فشار گيج ) Gauge pressure )
فشار خلاء) Vacuum )
فشار مطلق ) absolute pressure )-
واحدهاي فشار ) units of pressure )
بوردن تيوب
تيوب C شکل
تيوب فنري
يوب مارپيچي
ديافراگم
کپسول فشار
بيلوز
بوردن تيوب
کپسولهاي فشار
رنج
کاليبراسيون
هيسترزيس
خطاي هد
انتخاب فشار سنج
شوک فشار و فشار بيش از حد
گير کردن ) Stiction )
خطاي ديد ) Parallax error )
ارتعاشات بيش از حد ) Excessive Vibration )
نوسانات فشار ) Pressure Fluctuations )
فشار سنج تست در سايت
فشار سنج تست در کارگاه
ساختمان فشار سنج
اندازه گيري اختلاف فشار
ترانسميتر فشار
سيستم فلاپر نازل) - Flapper-Nozzle )
نيروي شناوري ) Buoyancy )
فشار ايسنا ) Hydrostatic head )
ماوراي صوت) Ultrasonic )
هدايت الکترنيکي
خازن الکتريکي
تشعشع ) Radiation )
توزين
مقاومت الکتريکي
اندازه گيري ارتفاع سطح مايعات به روش مستقيم
در اين روش تغييرات حقيقي، مستقيماً اندازه گيري ميشوند. از جمله وسايل
اين روش عبارتند از
خط کشهاي عمق سنج ) Dip stick )
شاقول و نوار فلزي ) Dip tape )
ارتفاع سنجها ) Level gauges )
انواع ارتفاع سنجها ) Level gauges )
ارتفاع سنجها به سه دسته تقسيم ميشوند که عبارتند از
ارتفاع سنج با لوله شيشه اي
ارتفاع سنج با شيشه تخت
ارتفاع سنج مغناطيسي
نمايش کلي گيج گلاس
اندازه گيري فلو
Flow Measurement
اندازه گيري با اورفيس
صفحه اوريفيس (
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: اندازه گيری فشار,pressure measurement,انواع اندازه گيري فشار,فشار گيج gauge pressure,فشار خلاء vacuum,فشار مطلق absolute pressure,واحدهاي فشار units of pressure,بوردن تيوب,تيوب c شکل,تيوب فنري,يوب مارپيچي,ديافراگم,کپسول فشار,بيلوز,بوردن تيوب,کپسولهاي فشار,رنج,کاليبراسيون,هيسترزيس,خطاي هد,انتخاب فشار سنج,شوک فشار و فشار بيش از حد,گير کردن stiction,خطاي ديد parallax error,ارتعاشات بيش از حد excessive vibration,نوسانات فشار pressure fluctuations,فشار سنج تست در سايت,فشار سنج تست در کارگاه,ساختمان فشار سنج,اندازه گيري اختلاف فشار,ترانسميتر فشار,سيستم فلاپر نازل flapper nozzle,نيروي شناوري buoyancy,فشار ايسنا hydrostatic head,ماوراي صوت ultrasonic,هدايت الکترنيکي,خازن الکتريکي,تشعشع radiation,توزين,مقاومت الکتريکي,اندازه گيري ارتفاع سطح مايعات به روش مستقيم,در اين روش تغييرات حقيقي,مستقيما اندازه گيري ميشوند از جمله وسايل,اين روش عبارتند از,خط کشهاي عمق سنج dip stick,شاقول و نوار فلزي dip tape,ارتفاع سنجها level gauges,انواع ارتفاع سنجها level gauges,ارتفاع سنجها به سه دسته تقسيم ميشوند که عبارتند از,ارتفاع سنج با لوله شيشه اي,ارتفاع سنج با شيشه تخت,ارتفاع سنج مغناطيسي,نمايش کلي گيج گلاس,اندازه گيري فلو,flow measurement,اندازه گيري با اورفيس,صفحه اوريفيس
دانلود رایگان کتاب مشخصات فنی طراحی سیستم Pig Trap خط لوله
مشخصات فنیطراحی سیستم Pig Trapخط لوله
محتوا:
معرفی
محدوده
ملاحظات نظارتی
تعاریف
اختصارات
مورد عمل اسکوپ
ارجاعات متقابل
مشخصات فنی
عمومی
بشکه
لوله
CONNECTIONS واحد
VALVES
پرده، عینک
زانو
PIG SIGNALLERS
جداسازی حفاظت کاتدیک و اتصالات
فشار و ابزار انازه گیری
SPHERE راه اندازی / / FLAPPERS
شرایط سرویس و کد مورد نیاز
کد طراحی
FACTOR DESIGN
فشار طراحی
درجه حرارت طراحی
سرعت DESIGN
فشار آزمون
کمک هزینه خوردگی
ONSHORE
OFFSHORE
تله PIG افقی
VERTICAL PIG
دسترسی به سیستم عامل
جنبه های طراحی تهیه مواد
عمومی
سرویس در دمای پایین
مشخصات مواد
منابع
ضمیمه انتخاب نوع VALVE
ضمیمه LOGIC SYSTEM
DESIGN OF PIPELINE PIG TRAP SYSTEMS
TABLE OF CONTENTS:
INTRODUCTION
SCOPE
DISTRIBUTION, INTENDED USE AND REGULATORY CONSIDERATIONS
DEFINITIONS
ABBREVIATIONS
ACTION ITEMS
CROSS-REFERENCES
TECHNICAL SPECIFICATION
GENERAL
BARREL
PIPEWORK
BRANCH CONNECTIONS
VALVES
END CLOSURES
SPECTACLE BLINDS
BENDS
PIG SIGNALLERS
CATHODIC PROTECTION ISOLATION AND EARTHING CONNECTIONS
SUPPORTS
PRESSURE INDICATORS
SPHERE LAUNCHING/RECEIVING PINS/FLAPPERS
SERVICE CONDITIONS AND CODE REQUIREMENTS
GENERAL
DESIGN CODE
DESIGN FACTOR
DESIGN PRESSURE
DESIGN TEMPERATURE
DESIGN VELOCITIES
TEST PRESSURE
CORROSION ALLOWANCE
LAY-OUT AND ANCILLARY FACILITIES
GENERAL
ONSHORE
OFFSHORE
HORIZONTAL PIG TRAPS
VERTICAL PIG LAUNCHERS
ACCESS PLATFORMS
DESIGN ASPECTS OF MATERIAL PROCUREMENT
GENERAL
LOW TEMPERATURE SERVICE
MATERIAL SPECIFICATIONS
REFERENCES
FIGURES
APPENDICES
APPENDIX VALVE TYPE SELECTION
APPENDIX INTERLOCK SYSTEM LOGIC
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: دانلود رایگان کتاب,پایپینگ,مشخصات فنی,طراحی سیستم pig trapخط لوله,معرفی,محدوده,تعاریف,اختصارات,مورد عمل اسکوپ,ارجاعات متقابل,مشخصات فنی,بشکه,لوله,connections واحد,valves,پرده,عینک,زانو,pig signallers,جداسازی حفاظت کاتدیک و اتصالات,فشار و ابزار انازه گیری,sphere راه اندازی flappers,شرایط سرویس و کد مورد نیاز,کد طراحی,factor design,فشار طراحی,درجه حرارت طراحی,سرعت design,فشار آزمون,کمک هزینه خوردگی,onshore,offshore,تله pig افقی,vertical pig,دسترسی به سیستم عامل,جنبه های طراحی تهیه مواد,عمومی,سرویس در دمای پایین,مشخصات مواد,منابع,ضمیمه انتخاب نوع valve,ضمیمه logic system,technical specification,design of pipeline pig trap systems,introduction,scope,quot distribution,intended use and regulatory considerations quot,definitions,abbreviations,action items,cross references,technical specification,general,barrel,pipework,branch connections,valves,end closures,spectacle blinds,bends,pig signallers,cathodic protection isolation,and earthing connections,supports,pressure indicators,sphere launching,receiving pins,flappers,service conditions,code requirements,general,design code,design factor,design pressure,design temperature,design velocities,test pressure,corrosion allowance,lay out and ancillary facilities,general,onshore,offshore,horizontal pig traps,vertical pig launchers,access platforms,design aspects,material procurement,general,low temperature service,material specifications,references,figures,appendices,valve type selection,interlock system logic
دانلود رایگان کتاب فهرست واژگان و کلمات اختصاری ابزار دقیق
فهرست واژگان و کلمات اختصاری ابزار دقیق
Free Download
NO ABBRA. DESCRIPTION
ADV AUTOMATIC DELUGEVALVE
AS AIRSUPPLY
ASC ALARMSWITCH CALIBRATION CERTIFICATE
AT ANALYZER TRANSMITTER
AV ANALYZER VALVE
B.V BYVENDOR
BDV BLOW DOWN VALVE
BE FLAME DETECTOR
BI BURNERIGNITER
CAB CABINET
CAD COMPUTER AIDED DESIGN
CP CORROSION PROBE
CV CONTROL VALVE
DCS DISTRIBUTECONTROL SYSTEM
DGC GAS DETECTOR POINT TYPE - DUTY : FREESPACE - COMBUSTIBLE
DGCR GAS DETECTORRESERVE LINEOFSIGHT/OPEN PATHCOMBUSTIBLE
DGCT GAS DETECTORTRANSMITTER LINE OF SIGHT/OPEN PATH
COMBUSTIBLE
DGT TOXICGAS DETECTOR
DIS DIGITAL ALARMSOUNDER
DPT D/P TRANSMITTER
E ELEMENT THERMOCOUPLE, RTD
EBD EMERGENCY BLOW DOWNSYSTEM WHICH IS INCLUDEDINESD SYSTEM
EBDV EMERGENCYBLOW - DOWN VALVE
EDP EMERGENCY DEPRESSURIZING SYSTEM WHICH IS INCLUDED IN ESD
SYSTEM
EDPV EMERGENCYDEPRESSURIZING VALVE
EL ELEVATION
ENG ENERGIZED
ESD EMERGENCY SHUTDOWN SYSTEM WHICH IS PLC
ESDV EMERGENCYSHUTDOWNVALVE
EWS ENGINEERING WORKSTATION
F&G FIRE & GASSYSTEM
F.G.L FINISHEDGRADELEVEL
F.O FIBEROPTIC
F.O.C FIBER OPTICCABLE
FA FLAME ARRESTER
FAT FACTORY ACCEPTANCE TEST
FAT TRIPALARM
FC FLOW CONTROLLER
FCS FIELDCONTROLSYSTEM
FDS FUNCTION DESIGN SPECIFICATION
FE FLOW ELEMENT ORIFICE PLATEASSEMBLY
FGD FIR, SMOKE, FLAME, HEAT MANUAL, ALARM CONTACT AND
ITCHEDEVICEDETECTOR AND ZONE LOOP ACCEPTANCE
FGH REMOTE HALONINDICATOR ACCEPTANCE CERTIFICATE
FI FLOW INDICATOR
FIC FLOW INDICATOR CONTROLLER
FIS FLOW INDICATOR SWITCH
FMI FIELDMOUNTEDINSTRUMENT INSPECTION
FS FLOW SWITCH
FT FLOW TRANSMITTER
FV FLOW VALVE
FY I/PCONVERTER
GT GASDETECTOR
H.P.P HIGH POINTPAVING
H.V.A.C HEAT VENTILATORAIR-CONDITION
H.W.C HARD WIRE CABLE
HIPS HIGHINTEGRITY PROTECTION SYSTEM
HIPV HIGHINTEGRITY PROTECTION VALVE
HPV HIGH POINTVENT
HS HAND SWITCH SELECTOR SWITCH
HV HAND OPERATED VALVE
HXB HORNS/ALARM BELLS
I LOCAL INDICATOR
I.S INST SIGNAL
I/O INPUT / OUTPUT
IAS INSTRUMENTAIR SUPPLY
IAS INSTRUMENTAIR SUPPLY TEST REPORT
IISCS MISCELLANEOUS
ILA INSTRUMENT LOOPACCEPTANCE
ILI INSTRUMENT LOOPINTERIM INSPECTION
ILP IMPULSE LINE PRESSURE TEST REPORT
IPT INSTRUMENTPIPING AND TUBING INSPECTION
IS GROUNDING BUS BARFOR INTRINSICSAFETY
IS INTRINSICALLY SAFE
JBI INSTALLATION ANDINSPECTIONFOR JUNCTION BOX
L.C LOCKED CLOSE
L.O LOCK OPEN
L.O LOCKED OPEN
LAB LABORATORY
LCP LOCALCONTROLPANEL
LCR LOCALCOMPRESSORROM
LDC LEVELDISPLACEMENT CALIBRATIONCERTIFICATE
LER LOCALEQUIPMENT ROOM
LG LEVEL GAUGE
LI LEVEL INDICATOR
LP LOCAL CONTROL PANEL
LS LEVEL SWITCH
LT LEVEL TRANSMITTER
LT-G TANKLEVEL GAUGE
LV LEVEL VALVE
LY I/PCONVERTER
M MISCELLANEOUS
MCC MOTORCONTROLCENTER
MCT MULTICORETRANSIT
MET METERING SYSTEM
MMI MAN MACHININTERFACE
MOV MOTOROPERATED VALVE
MRU MERCAPTAN REMOVAL UNIT
MSH MAIN SWITCH HOUSE
MZ LIMIT SWITCH
MZLC LIMIT SWITCHCLOSE
MZLO LIMIT SWITCHOPEN
N.C NORMALLY CLOSE
N.O NORMALLY OPEN
NIS GROUNDING BUSBAR FOR NON INTRINSIC SAFETY
P.B. PUSHBUTTON
P.O. POSITIONER OUTPUT
PAH PRESSURE ALARM HIGH
PAL PRESSURE ALARM LOW
PCR PROCESS CONTROL ROOM
PCV PRESSURE REGULATOR
PD PIGDETECTOR
PDAH PRESSURE DIFFERENTIALALARM HIGH
PDB POWER DISTRIBUTIONBOARD
PDG PRESSURE DIFFERENTIAL GAUGE
PDI PRESSURE RECEIVER GAUGE
PDSH PRESSURE DIFFERENTIALSWITCH HIGH
PDT D/P TRANSMITTER PRESSURE
PG PRESSURE GAUGE
PI PRESSURE INDICATOR
PLC PROGRAMMABLE LOGIC CONTROLLER
PMS POWER MANAGEMENT SYSTEM
PMS PUMP MANAGEMENT SYSTEM
PNL GROUNDING BUSBAR FOR PANEL
PS PRESSURE SWITCH
PSH PRESSURE SWITCH HIGH
PSL PRESSURE SWITCH LOW
PSV PRESSURE SAFETY RELIFEVALVE
PT PRESSURE TRANSMITTER
PT PRESSURE TRANSMITTER
PT PLATINUM OHM
PV PRESSURE VALVECONTROLVALVE
PVSV VACUUM RELIEF VALVE
PY I/PCONVERTER
R SOLENOID VALVE
R.L. REFERENCELEVEL
R.T.D. RESISTANCETEMPERATURE DETECTOR
RO RESTRICTIONORIFICE
S SWITCH FLOW, LEVEL,PRESSER, TEMPPUSH BUTTON
S.W.I.P. SEA WATER INTAKE PLAN
SAT SITE ACCEPTANCE TEST
SDV SHUT DOWN VALVE
SO SOLENOID VALVE
SQL STRUCTURE QUERY LANGUAGE
STR STRAINER
T TRANSMITTER
T/B TERMINAL BOX
TCU THYRISTOR CONTROL UNIT
TE TEMPERATURETRUE ELEMENT THERMOCOUPLE
TE THERMOCOUPLE
TG TEMPERATUREGAGE
TGS TANK GAUGING SYSTEM
TI TEMP. RECEIVERGAGE
TS TEMP. SWITCH
TT TEMP. TRANSMITTER
TV TEMP. VALVE CONTROL VALVE
TW TERMOWELL
TY I/PCONVERTER
UCM MERCAPTAN REMOVAL UNIT/ SEQUENCE CONTROL MRU PLC
UCP UNITCONTROLMODULE SWITCHISPLC SEQUENCE CONTROLFOR
MERCAPTANREMOVALUNIT
UCR UTILITY CONTROL ROOM
UPS UN- INTERRUPTIBLE POWERSUPPLY
VA PNEUMATIC VALVE POSITIONER
VB ELECTRIC VALVEPOSITIONER
VSH VIBRATION SWITCH
W LIMIT POSITION SWITCH
WS WORK STATION
WT WEATHER STATION
XA ALARM OVERRIDE
XL LIGHT
XV ON/OF VALVE SEQUENCE VALVE
XV SEQUENCE VALVE
Y RELAY I/P , P/I,CONVERTER , ETC
ZA POSITION ALARM
ZL INDICATOR
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: دانلود,دانلود رایگان,فهرست واژگان و کلمات اختصاری ابزار دقیق,Free Download,NO ABBRA DESCRIPTION,ADV AUTOMATIC DELUGEVALVE,AS AIRSUPPLY,ASC ALARMSWITCH CALIBRATION CERTIFICATE,AT ANALYZER TRANSMITTER,AV ANALYZER VALVE,B V BYVENDOR,BDV BLOW DOWN VALVE,BE FLAME DETECTOR,BI BURNERIGNITER,CAB CABINET,CAD COMPUTER AIDED DESIGN,CP CORROSION PROBE,CV CONTROL VALVE,DCS DISTRIBUTECONTROL SYSTEM,DGC GAS DETECTOR POINT TYPE DUTY FREESPACE COMBUSTIBLE,DGCR GAS DETECTORRESERVE LINEOFSIGHT OPEN PATHCOMBUSTIBLE,DGCT GAS DETECTORTRANSMITTER LINE OF SIGHT OPEN PATH,COMBUSTIBLE,DGT TOXICGAS DETECTOR,DIS DIGITAL ALARMSOUNDER,DPT D P TRANSMITTER,quot E ELEMENT THERMOCOUPLE,RTD quot,EBD EMERGENCY BLOW DOWNSYSTEM WHICH IS INCLUDEDINESD SYSTEM,EBDV EMERGENCYBLOW DOWN VALVE,EDP EMERGENCY DEPRESSURIZING SYSTEM WHICH IS INCLUDED IN ESD,SYSTEM,EDPV EMERGENCYDEPRESSURIZING VALVE,EL ELEVATION,ENG ENERGIZED,ESD EMERGENCY SHUTDOWN SYSTEM WHICH IS PLC,ESDV EMERGENCYSHUTDOWNVALVE,EWS ENGINEERING WORKSTATION,F amp G FIRE amp GASSYSTEM,F G L FINISHEDGRADELEVEL,F O FIBEROPTIC,F O C FIBER OPTICCABLE,FA FLAME ARRESTER,FAT FACTORY ACCEPTANCE TEST,FAT TRIPALARM,FC FLOW CONTROLLER,FCS FIELDCONTROLSYSTEM,FDS FUNCTION DESIGN SPECIFICATION,FE FLOW ELEMENT ORIFICE PLATEASSEMBLY,quot FGD FIR,SMOKE,FLAME,HEAT MANUAL,ALARM CONTACT AND quot,ITCHEDEVICEDETECTOR AND ZONE LOOP ACCEPTANCE,FGH REMOTE HALONINDICATOR ACCEPTANCE CERTIFICATE,FI FLOW INDICATOR,FIC FLOW INDICATOR CONTROLLER,FIS FLOW INDICATOR SWITCH,FMI FIELDMOUNTEDINSTRUMENT INSPECTION,FS FLOW SWITCH,FT FLOW TRANSMITTER,FV FLOW VALVE,FY I PCONVERTER,GT GASDETECTOR,H P P HIGH POINTPAVING,H V A C HEAT VENTILATORAIR CONDITION,H W C HARD WIRE CABLE,HIPS HIGHINTEGRITY PROTECTION SYSTEM,HIPV HIGHINTEGRITY PROTECTION VALVE,HPV HIGH POINTVENT,HS HAND SWITCH SELECTOR SWITCH,HV HAND OPERATED VALVE,HXB HORNS ALARM BELLS,I LOCAL INDICATOR,I S INST SIGNAL,I O INPUT OUTPUT,IAS INSTRUMENTAIR SUPPLY,IAS INSTRUMENTAIR SUPPLY TEST REPORT,IISCS MISCELLANEOUS,ILA INSTRUMENT LOOPACCEPTANCE,ILI INSTRUMENT LOOPINTERIM INSPECTION,ILP IMPULSE LINE PRESSURE TEST REPORT,IPT INSTRUMENTPIPING AND TUBING INSPECTION,IS GROUNDING BUS BARFOR INTRINSICSAFETY,IS INTRINSICALLY SAFE,JBI INSTALLATION ANDINSPECTIONFOR JUNCTION BOX,L C LOCKED CLOSE,L O LOCK OPEN,L O LOCKED OPEN,LAB LABORATORY,LCP LOCALCONTROLPANEL,LCR LOCALCOMPRESSORROM,LDC LEVELDISPLACEMENT CALIBRATIONCERTIFICATE,LER LOCALEQUIPMENT ROOM,LG LEVEL GAUGE,LI LEVEL INDICATOR,LP LOCAL CONTROL PANEL,LS LEVEL SWITCH,LT LEVEL TRANSMITTER,LT G TANKLEVEL GAUGE,LV LEVEL VALVE,LY I PCONVERTER,M MISCELLANEOUS,MCC MOTORCONTROLCENTER,MCT MULTICORETRANSIT,MET METERING SYSTEM,MMI MAN MACHININTERFACE,MOV MOTOROPERATED VALVE,MRU MERCAPTAN REMOVAL UNIT,MSH MAIN SWITCH HOUSE,MZ LIMIT SWITCH,MZLC LIMIT SWITCHCLOSE,MZLO LIMIT SWITCHOPEN,N C NORMALLY CLOSE,N O NORMALLY OPEN,NIS GROUNDING BUSBAR FOR NON INTRINSIC SAFETY,P B PUSHBUTTON,P O POSITIONER OUTPUT,PAH PRESSURE ALARM HIGH,PAL PRESSURE ALARM LOW,PCR PROCESS CONTROL ROOM,PCV PRESSURE REGULATOR,PD PIGDETECTOR,PDAH PRESSURE DIFFERENTIALALARM HIGH,PDB POWER DISTRIBUTIONBOARD,PDG PRESSURE DIFFERENTIAL GAUGE,PDI PRESSURE RECEIVER GAUGE,PDSH PRESSURE DIFFERENTIALSWITCH HIGH,PDT D P TRANSMITTER PRESSURE,PG PRESSURE GAUGE,PI PRESSURE INDICATOR,PLC PROGRAMMABLE LOGIC CONTROLLER,PMS POWER MANAGEMENT SYSTEM,PMS PUMP MANAGEMENT SYSTEM,PNL GROUNDING BUSBAR FOR PANEL,PS PRESSURE SWITCH,PSH PRESSURE SWITCH HIGH,PSL PRESSURE SWITCH LOW,PSV PRESSURE SAFETY RELIFEVALVE,PT PRESSURE TRANSMITTER,PT PRESSURE TRANSMITTER,PT PLATINUM OHM,PV PRESSURE VALVECONTROLVALVE,PVSV VACUUM RELIEF VALVE,PY I PCONVERTER,R SOLENOID VALVE,R L REFERENCELEVEL,R T D RESISTANCETEMPERATURE DETECTOR,RO RESTRICTIONORIFICE,quot S SWITCH FLOW,LEVEL,PRESSER,TEMPPUSH BUTTON quot,S W I P SEA WATER INTAKE PLAN,SAT SITE ACCEPTANCE TEST,SDV SHUT DOWN VALVE,SO SOLENOID VALVE,SQL STRUCTURE QUERY LANGUAGE,STR STRAINER,T TRANSMITTER,T B TERMINAL BOX,TCU THYRISTOR CONTROL UNIT,TE TEMPERATURETRUE ELEMENT THERMOCOUPLE,TE THERMOCOUPLE,TG TEMPERATUREGAGE,TGS TANK GAUGING SYSTEM,TI TEMP RECEIVERGAGE,TS TEMP SWITCH,TT TEMP TRANSMITTER,TV TEMP VALVE CONTROL VALVE,TW TERMOWELL,TY I PCONVERTER,UCM MERCAPTAN REMOVAL UNIT SEQUENCE CONTROL MRU PLC,UCP UNITCONTROLMODULE SWITCHISPLC SEQUENCE CONTROLFOR,MERCAPTANREMOVALUNIT,UCR UTILITY CONTROL ROOM,UPS UN INTERRUPTIBLE POWERSUPPLY,VA PNEUMATIC VALVE POSITIONER,VB ELECTRIC VALVEPOSITIONER,VSH VIBRATION SWITCH,W LIMIT POSITION SWITCH,WS WORK STATION,WT WEATHER STATION,XA ALARM OVERRIDE,XL LIGHT,XV ON OF VALVE SEQUENCE VALVE,XV SEQUENCE VALVE,quot Y RELAY I P,P I,CONVERTER,ETC quot,ZA POSITION ALARM,ZL INDICATOR
دوره آموزشی تئوری لوله کشی صنعتی
دوره آموزشی تئوری لوله کشی صنعتی
لینک دانلود – آشنائی با مقدمات و تعاریف اولیه و مدارک بخش
، Line list ، P&ID ، Isometric ، Piping plan ، Key plan ، Plot plan 2 – آشنائی با مدارک
و .... Pd-info ، Standard pipe support ، Valve list
Piping 3 – معرفی کدها و استانداردهای معمول در طراحی
4 – روش محاسبه و تعیین ضخامت جدار لوله ها و اتصالات و کلاس کاری شیرها و فلنجها
Piping 5 – معرفی و تشریح اقلام و اتصالات نرمال و خاص مورد استفاده در
در اطراف تجهیزات مختلف و الزامات مربوطه Piping 6 – آموزش روشهای طراحی
Process & Mechanical & Vendor data sheet 7 – آشنائی با مدارک
و الزامات مربوطه Pipe Rack 8 – آموزش روشهای طراحی
و اصول انتخاب جنس Piping 9 – آشنائی با جنس های مورد استفاده در
و اهمیت تهیه این مدرک در هر پروژه PMS 10 – آشنائی با مدرک
11 – آموزش روش ساپورت گذاری لوله ها و آشنائی با انواع مختلف نگهدارنده های لوله
12 – تئوری آنالیز تنش در سیستم های لوله کشی صنعتی
(U/G) 13 – اصول طراحی سیستم های لوله کشی زیرزمینی
(Design to Cost) 14 – انتقال تجربیات شخصی در خصوص طراحی بهینه سایت های صنعتی
آشنائی با مقدمات و تعاریف اولیه
Piping -1-1 لزوم پیدایش تخصص
در یک پروژه صنعتی Piping -2-1 میزان کار و حدود قیمت
در برآورد قیمت و تهیه پیشنهاد فنی و مالی پروژه Piping -3-1 حدود کار بخش
-4-1 تشریح مراحل ابلاغ و اجرای یک پروژه صنعتی
پس از ابلاغ پروژه Piping -5-1 فعالیت های اصلی بخش
-6-1 تشریح مختصری از فعالیت سایر بخش ها پس از ابلاغ پروژه
Plant در طراحی Piping -7-1 مسئولیت بخش
Plant -8-1 سوابق کار مورد نیاز و اطلاعات عمومی جهت طراحی
-9-1 توجه به محل استقرار ساختمانها و تجهیزات صنعتی و گردش کار
-10-1 توجه به مسیر شبکه های زیربنائی و تقاطع و گردش مجاز جاده ها
-11-1 توجه به محدودیت های ارتفاعی سایت و امکانات رفاهی بهره برداران
Sleeper way یا Pipe rack -12-1 تصمیم گیری در مورد استفاده از
-13-1 توجه به مسیر حرکت ترنچ ها و لوپ های مورد نیاز
-14-1 طراحی محل های اسکان موقت در حین اجرای پروژه
-15-1 طراحی شبکه های آب و فاضلاب و دفع پساب جهت محوطه های اسکان موقت
-16-1 توجه به جهت باد قالب در منطقه و تاثیر آن بر جانمائی تجهیزات
-17-1 تصمیم گیری در مورد کفسازی محوطه های مختلف
-18-1 پیش بینی مسیرهای عبور جرثقیل و بوژی
-19-1 توجه به عدم امکان اجرای فونداسیون بر روی خاک دستی و توجه به ابعاد فونداسیون ها
و استفاده بهینه از این اختلاف ارتفاع Plant -20-1 توجه به اختلاف ترازهای محوطه
توجه به مسائل
Feed -23-1 تعیین محل ایستگاه های تقلیلل فشار گاز و یا دریافت
-24-1 مقاومت سازه ها در مقابل حریق
Alarm valve & gung -25-1 شبکه آتش نشانی محوطه و محل نصب
-26-1 شبکه آب خنک کننده محوطه و برج های خنک کن
-27-1 شبکه هوای فشرده ، بخار ، آب سرویس و نیتروژن مورد نیاز سایت
Utility station -28-1 پیش بینی محل نصب و پوشش مناسب واحدهای
Gas station , Weigh bridge , Container -29-1 پیش بینی تمهیدات خاص برای ساختمان های ویژه مانند
Preparation area
-30-1 بررسی عملی و اقتصادی بودن و لزوم نصب تجهیزات در ارتفاع و سازه های طبقاتی
-31-1 محدودیت های نصب تجهیزات در طبقات
-32-1 استفاده از سازه های بتنی یا فولادی و برآورد صرفه اقتصادی
در مرحله طراحی پایه Piping -33-1 معرفی مدارک تولید شده در بخش
Pipe sizing criteria *
Piping insulation schedule *
Pipe strength calculation *
Plot plan finalization *
P&ID mechanization *
Piping design instruction *
Piping material selection *
Preliminary pipes routing design *
Piping assembly drawingsو مسیرهای فرار اضطراری Retube -21-1 طراحی مسیرهای دسترسی به تجهیpd-info) *
Line numbering & Tag numbering procedure & Title blocks *
در مرحله طراحی دیتیل Piping -34-1 معرفی مدارک تولید شده در بخش
Piping material specification (PMS) *
Piping electronic specifications for 3d-modeling *
Piping conceptual layout *
Plant 3d-model *
Piping Arrangement drawings *
Piping isometric drawings *
Piping isometric drawings for fabrication *
Piping stress analysis report *
Standard pipe support & support list *
Pipe hanger schedule *
Safety valve & Silencer design report *
Line list *
Valve list *
POS for safety valve & silencer & the other elements *
Steam tracing & jacketing specification & drawings & details *
Final material take-off (MTO) *
Technical bid evaluation (TBE) & vendor document review (VDR) *
Painting schedule & color coding *
Sampling system design & sample cooler detail drawingsزات و فضاهای
plan 2 – آشنائی با مدارک
و .... Pd-info ، Standard pipe support ، Valve list
Plot plan -1-2 آشنائی با مدرک
North of plant *
Prevailing wind *
High point of paved area elevation *
Elevation from mean sea level *
Routing and coordination of the roads *
Routing of pipe racks and sleeper ways *
Routing of U/G trenches and it’s related loops *
Equipment coordination *
Equipment tag-no *
Equipment fixed and sliding saddle *
Equipment installation sections and elevations *
Structures coordination *
Structures tag-no *
Structures column numbers *
Structure and pipe rack sections and elevations *
Location , dimension and coordination of U/G pits *
Location , dimension and coordination of GPRS *
All utility and offsite buildings location , dimension and coordination *
The name of all equipment , structures and buildings *
آشنائی با مدرک
North of plant *
Drawing scale based on the contract requirements *
Zone , unit & area limits *
Coordination of each area limits *
A/G Zone , unit & area numbering *
U/G Zone , unit & area numbering *
Piping conceptual layout & Piping arrangement plan -3-2 آشنائی با مدرک
North of plant *
Drawing scale based on the contract requirements *
Area limits coordination *
Area limits references *
Equipment tag-numbers *
Equipment installation coordination *
Equipment nozzle chart *
Structures location & tag-numbers & column numbers *
Equipment coordination *
Equipment tag-no *
Equipment fixed and sliding saddle *
Equipment installation sections and elevations *
Structures coordination
Structures column numbers *
Platforms , ladders & stairs *
Elevation & height of all platforms , ladders & stairs *
All pd-info requirements *
All piping instruction requirements *
All contract requirements *
Piping routs *
Pipe line numbers & BOP or COP elevations *
All valves and fittings location *
All piping special items locations & tag-numbers *
Special requirements of piping around each equipment *
Control valve stations *
Utility stations and it’s related piping and details *
All pipe supports location & tag-numbers *
Instrument devices location & tag-numbers & detail of connections *
Tie-in points definition *
All required dimensions *
Interfaces by pipe rack area *
Elevation and coordination of tie-in points by U/G system *
Pits location and it’s related piping *
Fire fighting system
*
Sampling system piping & sample cooler details & location & coordination *
Reference drawings and documents *
Clash detection *
Piping Isometric -4-2 آشنائی با مدرک
North direction *
All piping , Valves and fittings *
Dimensions *
Welding or threading points numbering and location and quantity *
All connections coordination & elevations *
All pipes coordination & elevations *
Pipe supports location & tag-numbers *
Bill of material *
All pipe supports location & tag-numbers *
Piping special items tag-numbers *
Cut pipes definition *
Fabrication & erection items *
Commodity code
-5-2 آشنائی با مدرک
Equipment process information *
Line process conditions *
Line sizes *
Line numbers *
Line classes *
Line insulation *
Valve selection *
Piping fittings and special items *
Line to equipment & line to line connections *
Instrumentation *
Line list -6-2 آشنائی با مدرک
Line numbers *
Line classes *
Line sizes *
Line from-to *
Line process conditions *
Line base material *
Line specific material *
Hydro test and air test medium & pressure *
Line insulation class and thickness
*
Line P&ID number *
Line painting & color coding *
Manual valve list -7-2 آشنائی با مدرک
Valve tag-numbers *
Valve type *
Valve sizes *
Valve service *
Valve classes *
Valve rating *
Valve facing *
Valve process conditions *
Type of hand wheel operation *
Valve P&ID number *
Valve base material *
Valve specific material *
Standard & special pipe supports & pipe support schedule -8-2 آشنائی با مدرک
Support list and abbreviation *
Support details *
Support installation location & coordination in plant *
*
Pipe spring hangers *
Pd-info -9-2 آشنائی با مدرک
Structure single line diagram (SSLD) *
Pit single line diagram *
Equipment nozzle orientation *
Piping instructions -10-2 آشنائی با مدرک
Piping special details *
Piping general information for 3d-modeling *
Piping Assembly drawings *
Piping general notes *
-3 معرفی کدها و استانداردهای معمول در طراحی
به قرار ذیل میباشد : Piping -1-3 مهمترین کدهای مورد استفاده در طراحی
جهت طراحی خطوط لوله نیروگاه های حرارتی و سیکل ترکیبی : ASME B31.1 *
جهت طراحی خطوط لوله شبکه های توزیع گاز سوخت : ASME B31.2 *
جهت طراحی خطوط لوله در صنایع نفت و گاز و پتروشیمی : ASME B31.3 *
جهت طراحی خطوط لوله انتقال مایعات مختلف از جمله مایعات هیدروکربنی : ASME B31.4 *
جهت طراحی خطوط لوله سیستم های تبرید و سردخانه ها : ASME B31.5 *
جهت طراحی خطوط لوله انتقال و توزیع سیالات گازی : ASME B31.8 *
جهت طراحی لوله کشی سرویس های مختلف داخل ساختمانها : ASME B31.9 *
جهت طراحی خطوط لوله انتقال سیالات محلول مانند آب آهک : ASME B31.11 *
جهت طراحی بویلرهای نیروگاهی : ASME Section I *
مشخصات فنی مواد : ASME Section II *
جهت طراحی نیروگاه های هسته ای : ASME Section III *
جهت طراحی مخازن تحت فشار : ASME Section VIII *
به این مطلب امتیاز بدهید:
موضوعات مرتبط با این مطلب :
برچسب ها: دوره آموزشی تئوری لوله کشی صنعتی آشنائی با مقدمات و تعاریف اولیه و مدارک بخش,Line list,P amp ID,Isometric,Piping plan,Key plan,Plot plan 2 آشنائی با مدارک,و Pd info,Standard pipe support,Valve list,Piping 3 معرفی کدها و استانداردهای معمول در طراحی,4 روش محاسبه و تعیین ضخامت جدار لوله ها و اتصالات و کلاس کاری شیرها و فلنجها,Piping 5 معرفی و تشریح اقلام و اتصالات نرمال و خاص مورد استفاده در,در اطراف تجهیزات مختلف و الزامات مربوطه Piping 6 آموزش روشهای طراحی,Process amp Mechanical amp Vendor data sheet 7 آشنائی با مدارک,و الزامات مربوطه Pipe Rack 8 آموزش روشهای طراحی,و اصول انتخاب جنس Piping 9 آشنائی با جنس های مورد استفاده در,و اهمیت تهیه این مدرک در هر پروژه PMS 10 آشنائی با مدرک,11 آموزش روش ساپورت گذاری لوله ها و آشنائی با انواع مختلف نگهدارنده های لوله,12 تئوری آنالیز تنش در سیستم های لوله کشی صنعتی,U G 13 اصول طراحی سیستم های لوله کشی زیرزمینی,Design to Cost 14 انتقال تجربیات شخصی در خصوص طراحی بهینه سایت های صنعتی,آشنائی با مقدمات و تعاریف اولیه,Piping 1 1 لزوم پیدایش تخصص,در یک پروژه صنعتی Piping 2 1 میزان کار و حدود قیمت,در برآورد قیمت و تهیه پیشنهاد فنی و مالی پروژه Piping 3 1 حدود کار بخش,4 1 تشریح مراحل ابلاغ و اجرای یک پروژه صنعتی,پس از ابلاغ پروژه Piping 5 1 فعالیت های اصلی بخش,6 1 تشریح مختصری از فعالیت سایر بخش ها پس از ابلاغ پروژه,Plant در طراحی Piping 7 1 مسئولیت بخش,Plant 8 1 سوابق کار مورد نیاز و اطلاعات عمومی جهت طراحی,9 1 توجه به محل استقرار ساختمانها و تجهیزات صنعتی و گردش کار,10 1 توجه به مسیر شبکه های زیربنائی و تقاطع و گردش مجاز جاده ها,11 1 توجه به محدودیت های ارتفاعی سایت و امکانات رفاهی بهره برداران,Sleeper way یا Pipe rack 12 1 تصمیم گیری در مورد استفاده از,13 1 توجه به مسیر حرکت ترنچ ها و لوپ های مورد نیاز,14 1 طراحی محل های اسکان موقت در حین اجرای پروژه,15 1 طراحی شبکه های آب و فاضلاب و دفع پساب جهت محوطه های اسکان موقت,16 1 توجه به جهت باد قالب در منطقه و تاثیر آن بر جانمائی تجهیزات,17 1 تصمیم گیری در مورد کفسازی محوطه های مختلف,18 1 پیش بینی مسیرهای عبور جرثقیل و بوژی,19 1 توجه به عدم امکان اجرای فونداسیون بر روی خاک دستی و توجه به ابعاد فونداسیون ها,و استفاده بهینه از این اختلاف ارتفاع Plant 20 1 توجه به اختلاف ترازهای محوطه توجه به مسائل,Feed 23 1 تعیین محل ایستگاه های تقلیلل فشار گاز و یا دریافت,24 1 مقاومت سازه ها در مقابل حریق,Alarm valve amp gung 25 1 شبکه آتش نشانی محوطه و محل نصب,26 1 شبکه آب خنک کننده محوطه و برج های خنک کن,27 1 شبکه هوای فشرده,بخار,آب سرویس و نیتروژن مورد نیاز سایت,Utility station 28 1 پیش بینی محل نصب و پوشش مناسب واحدهای,Gas station,Weigh bridge,Container 29 1 پیش بینی تمهیدات خاص برای ساختمان های ویژه مانند,Preparation area,30 1 بررسی عملی و اقتصادی بودن و لزوم نصب تجهیزات در ارتفاع و سازه های طبقاتی,31 1 محدودیت های نصب تجهیزات در طبقات,32 1 استفاده از سازه های بتنی یا فولادی و برآورد صرفه اقتصادی,در مرحله طراحی پایه Piping 33 1 معرفی مدارک تولید شده در بخش,Pipe sizing criteria,Piping insulation schedule,Pipe strength calculation,Plot plan finalization,P amp ID mechanization,Piping design instruction,Piping material selection,Preliminary pipes routing design,Piping assembly drawingsو مسیرهای فرار اضطراری Retube 21 1 طراحی مسیرهای دسترسی به تجهیpd info,Line numbering amp Tag numbering procedure amp Title blocks,در مرحله طراحی دیتیل Piping 34 1 معرفی مدارک تولید شده در بخش,Piping material specification PMS,Piping electronic specifications for 3d modeling,Piping conceptual layout,Plant 3d model,Piping Arrangement drawings,Piping isometric drawings,Piping isometric drawings for fabrication,Piping stress analysis report,Standard pipe support amp support list,Pipe hanger schedule,Safety valve amp Silencer design report Line list,Valve list,POS for safety valve amp silencer amp the other elements,Steam tracing amp jacketing specification amp drawings amp details,Final material take off MTO,Technical bid evaluation TBE amp vendor document review VDR,Painting schedule amp color coding,Sampling system design amp sample cooler detail drawingsزات و فضاهای,plan 2 آشنائی با مدارک,و Pd info,Standard pipe support,Valve list,Plot plan 1 2 آشنائی با مدرک,North of plant,Prevailing wind,High point of paved area elevation,Elevation from mean sea level,Routing and coordination of the roads,Routing of pipe racks and sleeper ways,Routing of U G trenches and it s related loops,Equipment coordination,Equipment tag no,Equipment fixed and sliding saddle,Equipment installation sections and elevations,Structures coordination,Structures tag no,Structures column numbers,Structure and pipe rack sections and elevations,Location,dimension and coordination of U G pits,Location,dimension and coordination of GPRS,All utility and offsite buildings location,dimension and coordination,The name of all equipment,structures and buildings,آشنائی با مدرک,North of plant,Drawing scale based on the contract requirements,Zone,unit amp area limits,Coordination of each area limits,A G Zone,unit amp area numbering,U G Zone,unit amp area numbering,Piping conceptual layout amp Piping arrangement plan 3 2 آشنائی با مدرک,North of plant,Drawing scale based on the contract requirements,Area limits coordination,Area limits references,Equipment tag numbers,Equipment installation coordination,Equipment nozzle chart,Structures location amp tag numbers amp column numbers,Equipment coordination,Equipment tag no,Equipment fixed and sliding saddle,Equipment installation sections and elevations,Structures coordination,Structures column numbers,Platforms,ladders amp stairs,Elevation amp height of all platforms,ladders amp stairs,All pd info requirements,All piping instruction requirements,All contract requirements,Piping routs,Pipe line numbers amp BOP or COP elevations,All valves and fittings location,All piping special items locations amp tag numbers,Special requirements of piping around each equipment,Control valve stations,Utility stations and it s related piping and details,All pipe supports location amp tag numbers,Instrument devices location amp,tag numbers amp detail of connections,Tie in points definition,All required dimensions,Interfaces by pipe rack area,Elevation and coordination of tie in points by U G system,Pits location and it s related piping,Fire fighting system,Sampling system piping amp sample cooler details amp location amp coordination,Reference drawings and documents,Clash detection,Piping Isometric 4 2 آشنائی با مدرک,North direction,All piping,Valves and fittings,Dimensions,Welding or threading points numbering and location and quantity,All connections coordination amp elevations,All pipes coordination amp elevations,Pipe supports location amp tag numbers,Bill of material,All pipe supports location amp tag numbers,Piping special items tag numbers,Cut pipes definition,Fabrication amp erection items,Commodity code,5 2 آشنائی با مدرک,Equipment process information,Line process conditions,Line sizes,Line numbers,Line classes,Line insulation,Valve selection,Piping fittings and special items,Line to equipment amp line to line connections,Instrumentation,Line list 6 2 آشنائی با مدرک,Line numbers,Line classes,Line sizes,Line from to,Line process conditions,Line base material,Line specific material,Hydro test and air test medium amp pressure,Line insulation class and thickness,Line P amp ID number,Line painting amp color coding,Manual valve list 7 2 آشنائی با مدرک,Valve tag numbers,Valve type,Valve sizes,Valve service,Valve classes,Valve rating,Valve facing,Valve process conditions,Type of hand wheel operation,Valve P amp ID number,Valve base material,Valve specific material,Standard amp special pipe supports amp pipe support schedule 8 2 آشنائی با مدرک,Support list and abbreviation,Support details,Support installation location amp coordination in plant,Pipe spring hangers,Pd info 9 2 آشنائی با مدرک,Structure single line diagram SSLD,Pit single line diagram,Equipment nozzle orientation,Piping instructions 10 2 آشنائی با مدرک,Piping special details,Piping general information for 3d modeling,Piping Assembly drawings,Piping general notes,3 معرفی کدها و استانداردهای معمول در طراحی,به قرار ذیل میباشد Piping 1 3 مهمترین کدهای مورد استفاده در طراحی,جهت طراحی خطوط لوله نیروگاه های حرارتی و سیکل ترکیبی ASME B31 1,جهت طراحی خطوط لوله شبکه های توزیع گاز سوخت ASME B31 2,جهت طراحی خطوط لوله در صنایع نفت و گاز و پتروشیمی ASME B31 3,جهت طراحی خطوط لوله انتقال مایعات مختلف از جمله مایعات هیدروکربنی ASME B31 4,جهت طراحی خطوط لوله سیستم های تبرید و سردخانه ها ASME B31 5,جهت طراحی خطوط لوله انتقال و توزیع سیالات گازی ASME B31 8,جهت طراحی لوله کشی سرویس های مختلف داخل ساختمانها ASME B31 9,جهت طراحی خطوط لوله انتقال سیالات محلول مانند آب آهک ASME B31 11,جهت طراحی بویلرهای نیروگاهی ASME Section I,مشخصات فنی مواد ASME Section II,جهت طراحی نیروگاه های هسته ای ASME Section III,جهت طراحی مخازن تحت فشار ASME Section VIII